Viking G-3000P Скачать руководство пользователя страница 4

TECHNICAL DATA

3” MODEL G-3000P 

DOUBLE INTERLOCK PREACTION 

WITH ELECTRIC/PNEUMATIC RELEASE

The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058

Telephone: 269-945-9501  Technical Services: 877-384-5464  Fax: 269-818-1680  Email: [email protected]

Page 4 of 12

Form No. F_011610      18.10.25    P65

Figure 4 - Pressure Adjustment

Figure 2 - Alarm Pressure Switch Wiring

(Alarm Pressure Switch should be set to 5 PSI (0.34 bar)

Figure 3 - Air Supervisory Switch Wiring

FIELD ADJUSTMENTS: 

Alarm Pressure Switch:

 The operating point of the switch can be 

adjusted to any point between 4 PSI (0.27 bar) and 8 PSI (0.55 bar) 

by turning the adjustment knob(s) clockwise to raise the actuation 

point or counter-clockwise to lower the actuation point.

Air Supervisory Switch: 

The operating point of the switches can 

be  adjusted  to  any  point  between  10  PSI  (0.7  bar)  and  60  PSI 

(4.1 bar) by turning the adjustment knob(s) clockwise to raise the 

actuation point or counter-clockwise to lower the actuation point. 

The high and low switches are adjusted independently.

Special attention must be given to systems employing a bottled-gas supply. Because only a limited amount of gas is available, small 

leaks that normally would go unnoticed in systems being supplied by mechanical compressors, can become critical to the system’s 

overall performance. If the system is to function at temperatures as low as -40 °F (-40 °C), and, if bottled nitrogen is the gas supply, the 

system is particularly susceptible to leakage, and special care should be taken to ensure against leaks throughout the entire system.

C.   Air Supply Installation

1.  Install the required air supply as described in section 4.B. The size of the compressor and amount of air required should be 

determined in accordance with Tables 1, 2 & 3. The air or nitrogen supply to the preaction system must be clean, dry, and 

oil free.

2.  Automatic air supplies must be regulated, restricted, and from a continuous source. A Viking Air Maintenance Device should 

be installed on each system equipped with a tank mounted compressor, plant air or nitrogen. For compressors with a capacity 

less than 5.5 ft

3

/min at 10 PSI (0.154 m

3

/min at 0.69 bar), NFPA 13 does not require an air maintenance device. The use of 

an air maintenance device with riser mounted compressors can lead to compressor “short cycling”. Viking always recom-

mends that a tank mounted compressor with air maintenance device be used. This can become critical when accelerators 

are installed on the system. 

D.   Pressure Switch Wiring:

Wire the Alarm Pressure Switch (PS10) and Air Supervisory Switch (PS40), and adjust pressure settings as shown in Figures 2 - 4.

E.   Hydrostatic Test:

The Preaction System, including Sprinkler Piping and Sprinklers shall be hydrostatically tested at 200 PSI (13.79 bar) and maintained 

for 2 hours, in accordance with NFPA 13. Systems normally subjected to working system pressures in excess of 150 PSI (10.34 bar) 

shall be tested at a pressure of 50 PSI (3.45 bar) in excess of system working pressure.

F.   Placing the Valve in Service: 

(Refer to Figure 5)

When the Preaction System is ready to be placed in service, verify that the pneumatic release system is in a normal condition and 

that the electric release system has been reset.

1.  Verify that the water supply main control valve supplying the G-3000P Valve is closed.

2.  Close the prime valve.

3.  Open the main drain valve.

Содержание G-3000P

Страница 1: ...the system piping network The entire sprinkler system fills with water Double interlock electric pneumatic release preaction systems are commonly used in cold storage applications and other areas where it is important to control accidental water dis charge due to inadvertent damage to the sprinkler piping 2 LISTING AND APPROVALS cULus Listed VLFT FM Approved Refrigerated Area Sprinkler Systems 3 T...

Страница 2: ...ECTRIC PNEUMATIC RELEASE The Viking Corporation 210 N Industrial Park Drive Hastings MI 49058 Telephone 269 945 9501 Technical Services 877 384 5464 Fax 269 818 1680 Email techsvcs vikingcorp com Page 2 of 12 Form No F_011610 18 10 25 P65 Figure 1 Air Supply Options ...

Страница 3: ...of the most common are 122 Cu Ft at 1 900 PSI 3 455 L at 131 bar 225 Cu Ft at 2 100 PSI 6 372 L at 145 bar and 280 Cu Ft at 2 300 PSI 7 930 L at 159 bar When nitrogen cylinders are used as a primary air supply spare cylinders should be furnished and located at the valve location To determine the approximate amount of nitrogen to be furnished the following formula may be used Table 1 Pipe Capacity ...

Страница 4: ...Supply Installation 1 Install the required air supply as described in section 4 B The size of the compressor and amount of air required should be determined in accordance with Tables 1 2 3 The air or nitrogen supply to the preaction system must be clean dry and oil free 2 Automatic air supplies must be regulated restricted and from a continuous source A Viking Air Maintenance Device should be inst...

Страница 5: ...sing the valve Verify prime pressure has been established on the prime pressure gauge 8 Establish air pressure on the system 9 Verify that no water flows from the drip check when the plunger is pushed 10 When the priming pressure has been verified as being established slowly open the water supply control valve 11 When flow is developed from the flow test valve CLOSE the flow test valve 12 Fully op...

Страница 6: ... 18 10 25 P65 Figure 6 Set Position 5 OPERATION A In the Set position When air pressure is introduced into the sprinkler piping the sensing end of the pneumatic actuator is pressurized This closes the pneumatic actuator The closed pneumatic actuator and the normally closed solenoid valve prevent prime water from escap ing the prime chamber of the G 3000P Valve When prime water enters the prime cha...

Страница 7: ...point the prime water is still held in the prime chamber by the closed pneumatic actuator When a sprinkler operates air pressure is lost on the sensing end of the pneumatic actuator causing the pneumatic actuator to open With both the pneumatic actuator and solenoid valve open prime water is drained from the prime chamber causing the G 3000P Valve to open filling the sprinkler piping with water Wa...

Страница 8: ...ory pressure to be maintained Refer to section 4 INSTALLATION 6 Reset the system release control panel Alarms should stop When testing is complete return the system to service following steps 1 through 8 below B Full Flow Trip Test Refer to Figure 5 Performance of a trip test is recommended annually during warm weather Consider coordinating this test with operation testing of the detectors CAUTION...

Страница 9: ...lats of the coupling 6 remove the coupling 6 from the valve body 1 3 Inspect the coupling 6 and O rings 5 Replace if necessary using the instructions in O Ring Replacement Bulletin F_ 120611 F Removing Replacing the Prime Chamber Assembly Refer to Figure 11 1 The prime chamber assembly 4 is now held in place by two flanges on the outside diameter of the assembly Slide the prime chamber assembly 4 ...

Страница 10: ...orm No F_011610 18 10 25 P65 Figure 9 Optional Accessories Accessories 08055 Model E 1 Accelerator 14800 Model LD 1 Anti Column Device 16212 Drain Manifold Figure 8 16191 1 Assembly Part Number 16191 1 1 Model G 3000P Valve 1 Model G 3000P Double Interlock Electric Pneumatic Release Trim Includes NC Solenoid Pneumatic Actuator 1 12 Section of Schedule 10 Pipe and Coupling 1 Air Pressure Supervisor...

Страница 11: ...RIC PNEUMATIC RELEASE The Viking Corporation 210 N Industrial Park Drive Hastings MI 49058 Telephone 269 945 9501 Technical Services 877 384 5464 Fax 269 818 1680 Email techsvcs vikingcorp com Page 11 of 12 Form No F_011610 18 10 25 P65 Figure 10 Installation Dimensions ...

Страница 12: ...pper or UNS S30400 Stainless Steel 1 3 Anaerobic Adhesive 1 4 16075 Prime Chamber Assembly Brass EPDM Nitrile 304 Stainless Steel Bronze Alloy 1 5 O Rings EPDM and Nitrile 2 or 3 6 16074 Coupling UNS S17400 Stainless Steel 1 7 15941 Check Diaphragm EPDM 1 8 08081 1 2 13 x 1 1 4 HHS UNS S30400 Stainless Steel 10 9 Cover 65 45 12 Ductile Iron 1 10 Data Plate Aluminum 2 11 Tack Alloy Carbon Steel 4 R...

Отзывы: