7
C
Co
on
nn
ne
eccttiin
ng
g tth
he
e W
Waatte
err S
Su
up
pp
pllyy
LLe
evve
elliin
ng
g
IIN
NS
ST
TA
ALLLLA
AT
TIIO
ON
N
5. Slide brass nut over sleeve and screw nut into inlet port. Place
adjustable wrench on nut “1” attached to plastic waterline and
maintain position. Using second adjustable wrench, turn the lower
nut “2” counterclockwise and fully tighten the upper nut in place.
IIM
MP
PO
OR
RT
TA
AN
NT
T:: Do not overtighten. Cross threading may occur. See
figure 5
6. Pull on tubing to confirm connection is secure. Connect tubing to
frame with tubing clamp (C) and turn on water supply . See figure
6. Check for leaks and correct if necessary. Continue to observe
the water supply connection for two or three hours prior to moving
the refrigerator to its permanent location.
7. Monitor water connection for 24 hours. Correct leaks if necessary.
CAUTION
To protect property and refrigerator from damage, observe the following:
•Protect vinyl or other flooring with cardboard, rugs, or other protective material.
•Do not use power tools when performing leveling procedure.
M
Maatte
erriiaallss N
Ne
ee
ed
de
ed
d
•3/8” hex head driver
•Carpenter’s level
Figure 5
Figure 6
C
C
1
1
2
2
To enhance the appearance and maintain performance, the refrigerator
should be level.
N
NO
OT
TE
E:: Complete any required panel installation and/or water supply
connection before leveling. Refrigerator should be in its permanent location
prior to leveling.
1. Locate the stabilizing legs in the envelope in the freezer basket.
2. Install the stabilizing legs by tipping the refrigerator back slightly and
screwing the legs in clockwise. See figure 7.
3. Remove toe grille. Grasp firmly and pull outward to unclip. See figure 8.
Figure 8
Figure 7
Bottom of
Refrigerator