Installation on Flat Roofs
or Freestanding Installation
35
Assembling the Support Frame
1.
Install both mounting rails
to the
clamping brackets
as shown, then
tighten.
2.
Install the connection housing
to
the retaining plates
and clamping
brackets
as shown, then tighten.
The tube holders on the installation rails
must be in alignment with those in the
connection housing; align with string if
necessary.
3.
Where several collectors are installed
side-by-side, continue with “Joining
the Connection Housings” on page
42, otherwise continue with
“Installing the General Connection Kit
and Temperature Sensor” on page
43.
5
3
6
8
5
3
8
v
1
.1
IMPORTANT
Содержание VITOSOL 200-T SD2A 2m2 Series
Страница 51: ...51 5368 538 v1 1 ...