
Service
68
Necessary Tools
Testing/analysis equipment
Calibrated flue gas analyzer
Cleaning supplies
Hand brush
Rags
Vacuum cleaning
Possible replacement parts
Rope sealant for combustion chamber
door
Refractory for combustion chamber
door
Use only calibrated equipment.
Service Procedure
1. Shut-down heating system
1.
Ensure main power supply to
equipment, the heating system, and
all external controls has been
deactivated. Take precautions in both
instances to avoid accidental
activation.
2.
Close main oil supply valve near
burner and near tank.
2. Open combustion chamber door
1.
Disconnect power supply.
2.
Remove front panel
by lifting
panel up and out.
3.
Remove two bolts
of combustion
chamber door
and open.
Continued on following page.
5
6
7
1
0
4
4
v
1
.0
Ensure that warning concerning
fiberglass wool and ceramic fiber
materials on page 3 has been read
and understood before handling
insulation.
WARNING
NEVER ADJUST BURNER BY EYE.
WARNING
Always keep the manual fuel supply
valve shut off if the burner is shut
down for an extended period of time.
WARNING
A
C
B
D
Fig. 67
Never burn garbage or paper in the
unit, and never leave combustible
material around it.
WARNING