background image

 

 

     5

Fig. 7 
Remove blank screw using Allen key. 

Fig. 8 
Install burner support bracket (10mm hex extension bolt). 

 
 
 
 
 
 

 

 

 

 

 
 
 
 

 
 
 
 
 
 
 

 

 

 

 
 

 

NG burner to Vitoflame 200 

(continued) 

5352 565 v1.0 

Installation 

18. Remove blank screw from front 

burner plate and replace it with 
support bracket - extension bolt 
(Fig. 7 and 8). 

19. Fire the burner and make final

burner adjustment using a
combustion analyzer. 

20. For Natural gas the CO

2  

level

should be around  
9.4%, Oxygen O

2  

- 4.1% and

CO<25 ppm. 

21. Log the final setting results and 

attach printout from the 
analyzer to test sheet on the 
last page.   

22. Fax the test results to  

(519) 885-1134 immediately 
after the installation.  

 

Содержание Vitola VGA Retrofit

Страница 1: ...NG burner is produced and tested as the burner for Vitola 200 VB2 boilers with the assumption that combustion air will be supplied from beneath the original burner hood The retrofit burner hood is sm...

Страница 2: ...he four bolt mounting pattern Fig 1 and 2 Conversion procedure Remove three bolts and remove mounting flange with blast tube Drill out the blank profile mounting holes and finish the holes with round...

Страница 3: ...Open boiler door 4 Remove combustion chamber 5 Clean out the boiler 6 Inspect combustion chamber 7 Reinstall combustion chamber 8 Close and tighten boiler door 9 Replace burner gasket Fig 3 10 Install...

Страница 4: ...2 Install supplied double acting barometric MG1 vent damper on vent connector 13 Install FTS 4 spill switch as per the FTS 4 supplied instruction 14 Make final gas connection 15 Connect power cable wi...

Страница 5: ...plate and replace it with support bracket extension bolt Fig 7 and 8 19 Fire the burner and make final burner adjustment using a combustion analyzer 20 For Natural gas the CO2 level should be around 9...

Страница 6: ...continued 23 Attach burner hood to burner Fig 9 5352 565 v1 0 Installation IMPORTANT Sometimes the installer may experience some fitting difficulties with the gas pipe passing through the cut out ope...

Страница 7: ...ion from 2 oil to Natural gas Remember to cap the oil tank filler neck and give a conversion notice to the local oil supplying company Venting system must be inspected and calculated according to loca...

Страница 8: ...ay Road Waterloo Ontario N2V 2G5 Canada Tel 519 885 6300 Fax 519 885 0887 www viessmann com info viessmann ca Viessmann Manufacturing Company U S Inc 45 Access Road Warwick Rhode Island 02886 USA Tel...

Отзывы: