31
Preparing cables without integral cable grommet
2.
1.
Fig. 22
1.
Cut required openings in the cable grommets.
2.
Route cables through cable grommets and secure
with cable ties.
Note
■
Strip as little of the insulation as possible, close
to the terminals.
■
If 2 components are connected to the same ter-
minal, press both cores together in a
single
wire
ferrule.
Applying strain relief
1.
2.
Fig. 23
1.
Insert cables with cable grommet into the apertures
in the control unit enclosure.
2.
Secure cables with cable ties.
Overview of electrical connections
Part of heating system
Chapter
Page
Actuators, sensors and switches.
Connections for fuel supply system to
ZPK PCB of the control unit
Commissioning
Outside temperature sensor
Overview of electrical connections
Buffer temperature sensors
Overview of electrical connections
Heating circuits, solar circuit, DHW etc.
Connection options at the HKK PCB and extension kits via
KM-BUS
Electrical connections on the PCBs
Overview of the PCBs
Outside temperature sensor connection
Plug
!
: Outside temperature sensor
1
2
1
Fig. 24
Assignment
Function
Additional information
1
Ai
Pt1000
2
GND
—
Installation sequence
Electrical connections
(cont.)
5679249
Installation