background image

3

User Guide

5777744-03 GB Subject to technical changes!

1  User Guide

All important information for operation and control is 

summarized in these operating instructions.
Read the operating instructions completely and only 

use the product after you have first understood the 

operating instructions.
If you have any questions, please contact your Viess-

mann specialist partner. You will find the current ad

-

dress on the back page.

1.1  Target group

These instructions are aimed exclusively at authorized 

specialists.

 

Â

Electrical work to be performed exclusively by quali-

fied electricians.

 

Â

Initial commissioning is to be be performed exclu-

sively by the manufacturer or by a specialist desig-

nated and authorized by the manufacturer.

1.2  Structure of the operating instructions

1.2.1  Warnings
Structure of the warnings

Warnings are structured as follows:

SIGNAL 
WORD!

Source of danger!

Consequences of non-compliance.

 

f

Measure to avoid the danger.

Gradation of the warnings

Warnings differ according to the type of danger as fol-

lows:

DANGER!

Warns against an imminent threat of 

danger, which will lead to death or 

serious injuries if it is not avoided.

WARNING! Warns against a possibly dangerous 

situation, which will lead to death or 

serious injuries if it is not avoided.

CAUTION! Warns against a possibly dangerous 

situation, which will lead to moderate 

or minor injuries if it is not avoided.

NOTE

Warns against a possibly dangerous 

situation, which will lead to damage 

to property or the environment if it is 

not avoided.

Tips, notes, and recommendations

 

L

Gives the user tips, notes, or recommendations on 

using the product efficiently.

1.2.2  Additional symbols
Handling instructions

Handling instructions ask you to carry out an operation 

or a work step. Handling instructions should always be 

carried out individually and in the specified sequence.

Structure of the handling instructions:

 

Â

Instructions for an operation.

Results if required.

Lists

Structure of the unnumbered lists:

 

ƒ

List level 1

 

ˆ

List level 2

Structure of the numbered lists:

1. List level 1

1.1 List level 2

1.3  Related documents

Please also observe the additional documents pro-

vided (such as the delivery documents) and relevant 

standards and laws follow the safe and correct use of 

the device.

1.4  Safekeeping

Keep the Operating Manual, including the related 

documents, handy in the vicinity of the device.

Содержание TectoCell Standard Plus 100

Страница 1: ...e specialist Please save 5777744 03 GB 03 2019 TectoCell Standard Plus 80 cold rooms and deep freeze rooms TectoCell Standard Plus 100 cold rooms and deep freeze rooms TectoCell Standard Plus 120 deep freeze room TectoCell Standard Plus 150 deep freeze room ...

Страница 2: ...ition wall of combination rooms without tongue and groove system 10 4 10 Mounting the door 10 4 11 Mounting ceiling elements 10 4 12 Seal operating apertures in the cam locks in the wall and ceiling elements 11 4 13 Mount doorsill for rooms with floor elements 11 4 14 Remove transport securing plates 11 4 15 Adjusting the door 12 4 16 Light test 12 4 17 Attaching the cover caps 12 4 18 Fastening t...

Страница 3: ... which will lead to death or serious injuries if it is not avoided WARNING Warns against a possibly dangerous situation which will lead to death or serious injuries if it is not avoided CAUTION Warns against a possibly dangerous situation which will lead to moderate or minor injuries if it is not avoided NOTE Warns against a possibly dangerous situation which will lead to damage to property or the...

Страница 4: ...ezing rooms pull the power plug or shut off the mains power and secure it to prevent it from being turned back on f f Observe country specific stan dards and guidelines before working on electrical equipment DANGER Risk of death due to electric shock f f Do not conduct any mechanical work such as drilling or sawing on the inside or outside of the door or porthole see Chap 4 19 Mechani cal work on ...

Страница 5: ...e   Check packaging material for loose parts after unpacking   Dispose of packaging material in an environmentally compatible way according to local regulations NOTE Damage to the door f f If no door stop has been installed please make sure to carefully open the door in order to prevent dam ages to the door or the wall NOTE Damage from defective cold rooms and deep freezing rooms f f Ensure th...

Страница 6: ...p freezing rooms   Observe national and local rules on work safety and accident prevention measures   Observe local regulations on operation and mainte nance 4 2 Before installation   Make sure that the floor is level   Level uneven floor siehe Kap 4 3 Boden ausglei chen auf Seite 7   Contact Viessmann if it is not possible to comply with national and local regulations   Carefully remo...

Страница 7: ... sure that the wall elements are perpendicular Door element without floor L LDoor element without floor is delivered with securing for transportation and without door frame heating   Remove the door element s securing for transport before installation 4 3 Level floor 4 3 1 Room with floor ventilation L LRooms with floor ventilation Room temperature below 5 C   If the floor on site is not even ...

Страница 8: ... the opposing exterior side   Tighten interior eccentric cam locks 4 5 Assembling room elements Connect room elements as follows   Activate eccentric cam locks from inside of room First only operate the centre locks to enable the alignment of the walls   Check whether the room elements eccentric cam locks can be opened by turning left with Allen key   Make sure that the room elements are n...

Страница 9: ...rill hole at least 24 mm deep Countersunk rivet with Ø 5 0 mm Hand riveter with mouthpiece suitable for stain less steel for 5 0 countersunk rivet 4 7 Seal operating apertures in the cam locks in the floor elements L LUsing a steel hammer will run the risk of contamina tion with outside rust   1 2 3 4 Fill operating aperture 3 with the supplied heat insulation foam filler 4   Fill the operatin...

Страница 10: ...he aid of vacuum suction devices Make sure that the last wall set is flush with the other room walls at the upper edge 4 9 Assembling partition wall of combination rooms without tongue and groove system   B A Place partition wall at intended location   Fasten partition wall to the wall ceiling and floor ele ments with the enclosed fastening profiles 2   Make sure that the cover plate 1 is in...

Страница 11: ...e the stainless steel doorsill as a template for fix ing holes Ø 3 3 mm and drill out   Remove drilling chips   In order to prevent moisture from getting in apply sealing strip with the enclosed sealant 2 on the entire surface of the bottom of the doorsill   Distribute sealing strip   Lay stainless steel doorsill onto floor element and align it   Fasten stainless steel doorsill with encl...

Страница 12: ...all of the door s hinges L LMaximum adjustment range 3 mm 4 16 Light test   Conduct a light test to check whether light gets into the dark room through an open seal point 4 17 Attaching the cover caps   Place the cover caps onto the hinge so they are centred   Fit the narrow side of the cover caps in the recess in the hinge housing into slide blocks   Lock the mounting lugs into place by p...

Страница 13: ...luminaries L L 1 2 Moisture proof luminaries and junction box are mount ed at the factory on the inside of the door frame L LThe junction box with luminaries can be displaced by 90   Pull the luminary 1 from the mounting plate 2   Remove the plug from the pre punched fixing holes   Fasten mounting plate in its new position   Clip luminary to mounting plate 5 Electrical connections DANGER R...

Страница 14: ...o not use pointed or sharp edged objects   Only have work for the mains connection and instal lation of protective measures GFCI circuit breaker conducted by a specialised electrical contractor L LA device which simultaneously disconnects all non grounded conductors with at least 3 mm contact opening width from the mains plug connection or 2 pole switch is to be installed in the supply line to t...

Страница 15: ...  Observe product information on cleaning agents 8 Decommissioning For prolonged downtime   Pull the power plug or shut off the mains power   Ensure adequate ventilation 9 Technical data 9 1 Permissible loading on floor elements Load Weight Class Wheel Wheel Load N Wheel Load N m2 1 4 cm2 4 cm2 1 Rubber 400 1 600 30 000 2 PU Rubber 750 3 000 40 000 3 PU Rubber 1 000 4 000 50 000 4 PU Rubber 1...

Страница 16: ...od Further claims in particular for consequential dam ages are excluded We shall assume no warranty for damages resulting from improper or inappropriate use faulty installation or commissioning by the purchaser or third party natu ral wear and tear faulty or negligent handling chemi cal or electrochemical and electrical impacts provided that they cannot be attributed to our fault failure to observ...

Страница 17: ...BK3 GNYE L1 N Door contact switch o optional Switch 2 pole with indicator lights for cold room lighting N 4 Door frame heating optional Fixed leaf heater Fixed leaf window heater Active leaf window heater additional pressure compensation valve Sill heater Thermostat L1 4 only if heater is present Junction box Cold room heating optional Control panel Pressure compensation valve with heater optional ...

Страница 18: ...7744 03 GB Subject to technical changes 15 Wiring diagram for porthole 230 V AC 50 Hz mains connection PE N L1 PE T L1 4 N Thermostat L1 4 only if heater is present BN BN BU BU Junction box Frame heater Frame heater optional 5246454 08 0 ...

Страница 19: ...19 5777744 03 GB Subject to technical changes ...

Страница 20: ...on Systems Limited Telephone 44 1952 457157 sales viessmann coldtech co uk cooling viessmann co uk Austria Viessmann Kühlsysteme Austria GmbH Telephone 43 72 35 66367 0 office_vk_at viessmann com kuehlen viessmann at Belgium Viessmann Nederland B V Telephone 31 85 018 7460 info ref be viessmann com cooling viessmann com Czech Republic Viessmann spol s r o Telephone 420 257 090 900 viessmann viessm...

Отзывы: