Delivered condition
Boiler with the following components:
■ Fully wired flue gas fan with flue gas temperature sensor and
Lambda probe
■ Fully assembled return temperature raising facility
■ Buffer cylinder control valve with drive
■ Ash pans, stoking and cleaning equipment
■ Fully assembled casing panels
■ Ecotronic control unit
– Electronic module integrated in the boiler, incl. high limit safety cut-
out (STB)
■ 3 sensors (Pt1000) incl. sensor well (R ½, 280 mm long) wired jointly
to connector
■ Outside temperature sensor (Pt1000), supplied separately
■ Pre-installed lifting eye
Fully assembled return temperature raising facility
The return temperature raising facility is fully fitted to the connection
flange. It comprises a boiler pump, boiler control valve, flow and return
temperature sensor including connectors. The pump is located
between 2 shut-off valves.
Pyromat ECO
(cont.)
8
PYROMAT ECO
2
5822 546 GB
Содержание PYROMAT ECO
Страница 62: ...62 PYROMAT ECO ...
Страница 63: ...PYROMAT ECO 63 5822 546 GB ...