19
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
............................................................................................... 20
•
•
................................................................................................. 21
•
3. Removing the burner (if required)
.................................................................................... 21
•
•
................................................................................................ 22
•
•
5. Removing the inspection port closures
........................................................................... 22
•
6. Removing and cleaning the turbulators (if installed)
..................................................... 23
•
7. Cleaning the heating surfaces and flue gas collector
.................................................... 23
•
•
•
8. Checking the gaskets and packing cords on the flue gas side
•
•
•
•
•
10. Checking the thermal insulation components and gaskets
........................................... 24
•
•
•
11. Inserting turbulators (if installed) and closing boiler door(s)
........................................ 25
•
•
•
12. Closing and securing the inspection ports
..................................................................... 25
•
•
13. Mounting the burner (if required)
..................................................................................... 26
•
14. Checking the water chamber for deposits (M62, M82)
................................................... 27
•
•
15. Checking the connections and inspection ports on the water side for leaks
•
•
•
16. Checking the water level and system pressure
•
•
•
17. Checking the safety and control equipment
.................................................................... 28
•
•
•
................................................................................................. 28
•
•
19. Checking the water quality
................................................................................................ 28
•
•
20. Checking the thermal insulation
•
•
•
21. Checking the installation room ventilation
•
•
•
22. Checking the flue pipe for leaks
•
•
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6152553
Содержание M22
Страница 39: ...39 6152553 ...