Control system (BMS 2007)
12
CHP switching cabinet
VITOBLOC 200
5780078
GB
F7
– fault messages
starting speed < 50 Upm
sensors malfunctioning
ignition speed
seal test malfunctioning (OPTIONAL)
speed range not reached
safety shutdown (OPTIONAL)
speed < 1,200 Upm
heating water pump malfunctioning (OPTIONAL)
overspeed
malfunction knocking (OPTIONAL)
speed < 50 / pick-up defective
past service date
enabling malfunctioning
F8
– Reset, fault acknowledgement
You can acknowledge corrected faults with the F8 key.
Tab. 11
Assignment of function keys , Part 3
– F7 and F8
2.2
Analog measurement converter (analog box)
The analog measurement converter is installed
directly in the area of the sensitive measuring points
on the engine. It converts the special signals into a
serial data protocol that is transmitted to the control unit
via data line.
Measuring points
Signals to be converted
oil pressure
4
–20 mA
cooling water temperature
PT 100
temperature heating water return PT 100/2
PT 100
heating water control deselect PT 100/3
PT 100
exhaust gas temperature A
NiCrNi
lambda probe voltage
0
–50 mV
battery voltage
0
–30
V
Additionally available measuring points with modules with ANA 16
(EM-199/263, EM-238/363, EM-260/390, EM-401/549, EM-530/660)
Signals to be converted
engine oil temperature PT 100/4
PT 100
mixed gas temperature PT 100/5
PT 100
mixed cooling water temperature PT 100/6
PT 100
exhaust gas temperature B
NiCrNi
exhaust gas temperature C
NiCrNi
exhaust gas temperature D
NiCrNi
load pressure (Option)
4
–20 mA
Tab. 12 Analog measurement converter
Содержание EM-100/173
Страница 26: ...Terminal assignment for the CHP module control field 26 CHP switching cabinet VITOBLOC 200 5780078 GB ...
Страница 27: ...Terminal assignment for the CHP module control field VITOBLOC 200 CHP switching cabinet 27 5780078 GB ...
Страница 28: ...Terminal assignment for the CHP module control field 28 CHP switching cabinet VITOBLOC 200 5780078 GB ...
Страница 29: ...Terminal assignment for the CHP module control field VITOBLOC 200 CHP switching cabinet 29 5780078 GB ...
Страница 30: ...Terminal assignment for the CHP module control field 30 CHP switching cabinet VITOBLOC 200 5780078 GB ...
Страница 31: ...Terminal assignment for the CHP module control field VITOBLOC 200 CHP switching cabinet 31 5780078 GB ...
Страница 32: ...Terminal assignment for the CHP module control field 32 CHP switching cabinet VITOBLOC 200 5780078 GB ...
Страница 33: ...Terminal assignment for the CHP module control field VITOBLOC 200 CHP switching cabinet 33 5780078 GB ...
Страница 35: ...Notes VITOBLOC 200 CHP switching cabinet 35 5780078 GB ...