34
Overview of the heat pump control unit electrical connections
Note
■ Route 230 V~ cables and LV cables
separately and bundle them tightly
together at the terminals. This ensures
that, in case of failure, for example
when detaching a wire, the wires can-
not drift into the adjacent voltage area.
■ Strip the insulation as close to the ter-
minals as possible.
■ If two components are connected to
the same terminal, press both wires
together into a single wire ferrule.
Installation sequence
Electrical connections
(cont.)
5601 574 GB
Содержание BWT 221.A06
Страница 18: ...18 Removing the cylinder module 3 1 5 4 2x 2 Installation sequence Siting the heat pump cont 5601 574 GB ...
Страница 19: ...19 6 8 F6 X3 sG sH lJ aYH 7 Installation sequence Siting the heat pump cont 5601 574 GB Installation ...
Страница 20: ...20 aCH 10 9 Installation sequence Siting the heat pump cont 5601 574 GB ...
Страница 21: ...21 12 13 17 X20 14 2x 11 2x 15 16 Installation sequence Siting the heat pump cont 5601 574 GB Installation ...
Страница 22: ...22 4x 18 21 4x 6x 20 2x 19 Installation sequence Siting the heat pump cont 5601 574 GB ...
Страница 23: ...23 25 2x 24 4x 22 23 Installation sequence Siting the heat pump cont 5601 574 GB Installation ...
Страница 28: ...28 4 1 3 2 Installation sequence Siting the heat pump cont 5601 574 GB ...
Страница 71: ...71 Opening programming unit 2 2x 1 3 Troubleshooting Repairs cont 5601 574 GB Service ...
Страница 72: ...72 Removing cover from programming unit if necessary 5 4 4x Troubleshooting Repairs cont 5601 574 GB ...
Страница 105: ...105 0006 0005 0004 0001 0003 0002 0002 0003 Parts lists type BWT M 230 V Fitting set cont 5601 574 GB Service ...
Страница 122: ...122 5601 574 GB ...
Страница 123: ...123 5601 574 GB ...