44
Danger
Contact with live components can lead to seri-
ous injury from electric current.
Never touch
the terminal areas for the heat
pump control unit or power supply; see page 29.
Danger
The absence of component earthing can result
in serious injury from electrical current and in
component damage in the event of an electrical
fault.
Restore all earth connections.
!
Please note
Commissioning immediately after installation
can lead to appliance damage.
Wait
at least 30 min
between installing and
commissioning the appliance.
Note
Work on the refrigerant circuit may only be carried out
by qualified refrigeration engineers. Work on electrical
equipment may only be carried out by qualified electri-
cians.
1.
Remove top panel; see page 41.
2.
When work is complete, close the heat pump; see
page 41.
Regarding commissioning this appliance, see
also the operating instructions.
Compiling reports
Enter all readings taken during commissioning (descri-
bed below) in the reports on page 58 onwards.
Checking the refrigerant circuit for leaks
Check the floor area, valves and all visible solder joints
for traces of oil.
Note
Traces of oil indicate a leak in the refrigerant circuit.
Have your heat pump checked over by a refrigeration
engineer.
Filling and venting on the primary side
!
Please note
Commissioning when the primary circuit is
empty causes appliance damage.
Fill and vent the primary circuit before connect-
ing the power supply.
1.
Check the Victaulic connections in the heat pump
for tightness. The Victaulic couplings must be form-
locked and fitted together seamlessly.
2.
Check the pre-charge pressure of the expansion
vessel.
3.
Fill the primary circuit with Viessmann heat transfer
medium and vent.
Note
The system must be protected against frost down
to -15 °C.
!
Please note
Leaking hydraulic connections lead to appli-
ance damage.
■
Check tightness of the internal and on-site
hydraulic connections.
■
In the event of leaks, switch OFF the appli-
ance immediately. Drain the primary circuit
and check the seating of the seals.
Always
replace damaged or displaced
seal rings.
Commissioning, inspection, maintenance
Opening the heat pump
5789 986 GB
Содержание BW 30 .CS Series
Страница 52: ...52 Repairs Checking fuses cont 5789 986 GB Maintenance...
Страница 71: ...71 5789 986 GB...