
6
Disposal of packaging ............................................................................
Product information ................................................................................
Vitodens 100-W, type B1HF, B1KF .....................................................
Removing the boiler from the packaging ............................................... 14
Mounting the boiler and making connections ........................................ 15
Removing the front panel ................................................................... 15
Mounting the boiler on the pre-plumbing jig or mounting frame ......... 15
Fitting the boiler to the wall mounting bracket .................................... 17
Connections on the heating water and DHW sides ............................ 19
Condensate connection ......................................................................... 20
Filling the trap with water .................................................................... 20
Flue gas connection ............................................................................... 21
Gas connection ...................................................................................... 22
Gas installation to BS 6891:2005 ....................................................... 22
Opening the wiring chamber ............................................................... 23
Layout of the electrical connections ................................................... 24
On-site connections on the HMBU heat management unit ................ 25
Outside temperature sensor ............................................................... 25
Connecting the low loss header sensor
........................................ 25
Connecting the cylinder temperature sensor ...................................... 25
Connecting the DHW circulation pump (only type B1HF) ................... 25
Floating switching contact connection ................................................ 26
................................................................................. 27
Routing connecting cables/leads ........................................................ 28
WiFi operational reliability and system requirements ............................ 28
Wireless signal range of WiFi connection ........................................... 29
Angle of penetration ........................................................................... 29
Steps - commissioning, inspection and maintenance ............................ 31
Additional settings can be made only via software tool ...................... 60
Subscriber numbers of connected extensions ....................................... 61
Calling up the service menu ............................................................... 63
Exiting the service menu .................................................................... 63
Checking operating data ..................................................................... 64
Fault display on the programming unit ................................................... 65
Overview of electronics modules ........................................................... 66
Fault messages ..................................................................................... 66
Repairs .................................................................................................. 82
Shutting down the boiler ..................................................................... 82
Removing the boiler from the pre-plumbing jig or mounting frame ..... 83
Status/checking/diagnosing the internal circulation pump .................. 83
Index
Index
6167586