![Viessmann 7769566 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/viessmann/7769566/7769566_installation-and-service-instructions-for-contractors_1018015009.webp)
9
In a 3-phase power circuit
S
1 2 3 4 5 6
7 8 9 101112
13 14151617181920212223242526
N L1 L2 L3
L3
L2
L1
N
K
L
K
L
K
L
A
B
C
D
K
L
3 x 230 V~ /
400 V~
Fig. 4
A
From the main electricity meter
B
To the RCD
C
3 current sensors with 3 m connecting cables
(energy meter standard delivery)
D
Energy meter
Core assignment
1
Red
2
Black
3
Red
4
Black
5
Red
6
Black
Connect current sensors in the correct position, as
shown in fig. 4:
■
Green point facing in the direction of the RCD
■
Arrow of the "K
Ó
L" imprint (on the inside of current
sensor clip) pointing in the direction of the RCD
Electrical connections
Connecting the current sensors
(cont.)
5678 581 GB
Service