Check whether all electrical connections have
been correctly made.
2.
Commission the photovoltaic modules and inverter.
Photovoltaic module installation and service
instructions
and
Inverter installation and service instructions
3.
Switch ON the power supply. The energy meter
runs through an initialisation process. During this
process, the red LED flashes for 20 seconds.
Initialisation process successful:
Red LED is extinguished.
Initialisation process unsuccessful:
Red LED illuminates continually. For remedial
measures, see chapter "Fault messages" on
page 13.
Display elements
S 1 2 3 4 5 6 7 8 9 101112
13 14151617181920212223242526
N L1 L2 L3
1
2
Fig. 7
Interpreting the LED indicators
LED
LED meaning
Remedy
1
Green
Flashes Indicating effective power:
The LED flashes once every 10 Wh.
OFF
Immersion heater not connected.
See page 13
2
Green
Flashes Indicating apparent power:
The LED flashes once every 10 Wh.
OFF
Immersion heater not connected.
See page 13
No function
Red
Flashes During the initialisation process at the first start-up:
LED flashes for 20 s
Wait until initialisation
process has been
completed.
OFF
Initialisation process has been completed successfully.
ON
Error during initialisation process
See page 13
Green
ON
Energy meter is ready for operation.
Instructing the system user
Instruct the system user on how to operate the energy
meter in conjunction with the heating system as a
whole.
The instructions must cover the following points:
■
Operation of the energy meter
■
What to do in the event of a fault: Isolate the appli-
ance from the power supply. Notify your local heating
contractor.