background image

Install site protection of the flush actuation.
Attach protective caps for threaded rods onto WC ceramic.
Mount protective plug.

Carry out water connection.

Double clad WC element with IFGP cladding panels (model 8055.10)

(2 x 12.5 mm).

2x

Handling

Viega Eco Plus WC element

14 from  23

Содержание Eco Plus 8130.2

Страница 1: ...Viega Eco Plus Model Year built 8130 2 from 03 2014 en_INT Viega Eco Plus WC element Instructions for Use...

Страница 2: ...Viega Eco Plus WC element 2 from 23...

Страница 3: ...iew 6 2 3 2 Compatible components 7 2 3 3 Sound protection 9 2 3 4 Technical data 9 3 Handling 10 3 1 Assembly information 10 3 1 1 Mounting conditions 10 3 1 2 Installation dimensions 11 3 1 3 Requir...

Страница 4: ...es not extend to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling...

Страница 5: ...in Germany e g DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant...

Страница 6: ...om section Sound protection Scope Notice Regulations applicable in Ger many Fulfilled noise protection require ments DIN 4109 Fulfilled noise protection require ments DIN 4109 additional sheet 2 Fulfi...

Страница 7: ...not included in the scope of delivery model 8173 9 flush actuation site protection 2 3 2 Compatible components The WC element is compatible with all common WC ceramics even with larger projection barr...

Страница 8: ...isign for Style 12 8332 1 Flush plate Visign for Style 12 8332 4 Flush plate Visign for Style 13 8333 1 Flush plate Visign for Style 14 8334 1 Functional unit 8332 3 Visign for More Flush plate Visign...

Страница 9: ...Public 1 8326 21 Cover plate Visign for Public 8326 9 2 3 3 Sound protection The WC element complies with the noise insulation requirements speci fied in section Regulations from section Sound protec...

Страница 10: ...epth can be between 85 mm and 200 mm The WC element can only be used in combination with wall hung WCs fixing gauges for bore hole 180 mm or 230 mm The WC element can be extended by a remote actuation...

Страница 11: ...panner 10 mm 13 mm 17 mm 19 mm 3 2 Assembly 3 2 1 Mounting WC element Masonry and concreted walls You should use a support bracket model 8165 when mounting multiple WC elements with an interval of 490...

Страница 12: ...10 mm Drill holes Mount the fixing set with the fork spanner size 13 Align the height size 17 of the WC element in accordance with the height marking Mark fixing points on the floor Masonry wall X3 0...

Страница 13: ...nner size 13 and the screws and dowels supplied Set the installation depth of the pre wall element 200 mm with the fork spanner size 17 Mount WC threaded rods gauges for bore hole 180 or 230 mm Clip i...

Страница 14: ...ctuation Attach protective caps for threaded rods onto WC ceramic Mount protective plug Carry out water connection Double clad WC element with IFGP cladding panels model 8055 10 2 x 12 5 mm 2x Handlin...

Страница 15: ...nstruction height in accordance with the on site marking of the upper edge of the finished floor Pull WC element up height marking and align Tighten feet with the fork spanner size 17 Mark holes for f...

Страница 16: ...Attach element to floor size 13 Attach WC element to the support profiles using the screws sup plied Connect the WC element flush with the support profiles 10 13 4x Handling Viega Eco Plus WC element...

Страница 17: ...p in drain elbow Install site protection of the flush actuation Attach protective caps for threaded rods onto WC ceramic Mount protective plug If necessary mount a reducer Carry out water connection c...

Страница 18: ...055 10 2 x 12 5 mm 3 2 2 Converting actuation Actuation can take place optionally from the front or the top The actua tion is pre mounted from the front in delivery condition To convert actuation from...

Страница 19: ...the mounting of the mechanism Turn the mechanism s lock by 90 in an anti clockwise direction The mechanism is unlocked and can be removed Remove mechanism Remove upper revision cover Handling Viega Ec...

Страница 20: ...bottom edge of the mechanism are in the indentations in the revision shaft of the cistern Turn the mechanism s lock by 90 in a clockwise direction The mechanism is locked Hang the mechanism in the bo...

Страница 21: ...ation to the cistern x n min 1 0 m n max 1 7 m A corresponding empty pipe not included in the scope of delivery of the electrical actuation is required for the preparation of the electrical actuation...

Страница 22: ...e position approx 3 5 l n Bottom position approx 4 l The positions can be identified by the notches The WC element is factory set at a large flush volume of approx 6 l The large flush volume can be se...

Страница 23: ...ng on the inlet and drain valves The valves may have to be replaced depending on the extent of the deposits Depending on the position of the flush plate work on the concealed cistern can be carried ou...

Отзывы: