15
IM-FT 591480 0318
4 Bowl Installation
1
2
3
5
4
6
1.
Insert pipes fully into water
outlet and drain connection.
Mark a line at the connection
or finished wall, whichever is
furthest out from the carrier.
2. Now fully insert the pipes,
with their gaskets, into the
bowl. Use a strait edge to
mark the pipe on the same
plane as the back edge of the
china bowl.
3. Measure the distance
between the two lines. This
is the distance that needs to
be cut from the end of the
pipe. Mark this distance from
the end of the pipe and cut to
correct length.
4. Debur the cut end inside and
out. File around the outside
edge of the pipe to create an
angle to help easily insert the
pipe.
5. Apply plumbers grease to
the gaskets on the pipe and
to the gaskets on the carrier.
Insert the pipes into the bowl
and slide bowl into place with
pipes and threaded rods.
6. Secure bowl tightly to wall.
Note:
some connections may
be different depending on the
bowl manufacturer. Refer to
the manufacturer's installation
instructions for alternate bowl
mounting techniques. Caulk
around bowl if desired or if
recommended by the bowl
manufacturer.