Push the union nut, sliding ring and sealing onto the inlet pipe.
Push inlet pipe at least 1.5 cm deep into the drain inlet.
Screw the inlet pipe with the coupling onto the drain inlet.
3.2.2
Preparing for subsequent work
A few points must be observed to integrate the drain into the floor con‐
struction properly. For this reason, proceed as follows to prepare the
drain for subsequent work:
Requirements:
n
The drain is connected.
n
The inlet is connected.
n
The protective foil and the yellow protective plugs are to be found,
undamaged, on the drain.
Position the drain at the desired height at the place of use. It is
important that the upper edge of the drain flange is flush with the
upper edge of the sealing layer. If necessary, raise or lower the drain
in the existing floor using suitable material.
Align drain horizontally using a spirit level.
Secure the drain in such a way that it cannot shift when the subse‐
quent works are applied.
Most importantly, it must be ensured that the drain does not float
when the concrete or screed is poured in.
Handling
Advantix bath drain
17 from 21