![Viega Advantix base unit Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/viega/advantix-base-unit/advantix-base-unit_instructions-for-use-manual_1016606015.webp)
3.1.2
Installation dimensions
Fig. 6: Dimensional drawing model 4938
3.1.3
Tools and materials
n
Top with grate, if not included in scope of delivery
Ä
Chapter 2.3.1
„Overview“ on page 8
n
Material for securing the drain
3.2
Assembly
3.2.1
Connecting the drain
The connection to the wastewater system must be completed before
the drain can be installed in the floor construction. Proceed as follows:
Requirements:
n
A pipe to the planned drainage position is already in place for the
connection to the wastewater system.
n
The drainpipe has an internal sealing lip.
Required material
Connecting to the wastewater system
Handling
Advantix bath drain
15 from 21
Содержание Advantix base unit
Страница 2: ...Advantix bath drain 2 from 21...