3 Handling
3.1
Assembly information
3.1.1
Important note
Before assembly:
n
Check if the drainage capacity of the drain is sufficient for the arising
water volume
Chapter 2.2.3 „Drainage capacity“ on page 6.
n
Check if the installation height of the drain corresponds with the
planned floor construction.
n
Ensure that the required connection line is installed with the neces-
sary incline to the planned installation location.
During assembly:
n
Observe installation dimensions.
3.1.2
Installation dimensions
Fig. 3: Dimensional drawing
As at least three sealing lips must be inside the pipe, the following
installation heights occur:
Fig. 4: Minimum installation height
Handling
Advantix plug-in drain
9 from 14