
Seal the reducing nipple in on one side and pre-assemble with the
wall lead-in (size 22). Please ensure that the supplied rubber seals
are fitted correctly.
Provide a connection to the piping system on site.
Seal the flexible hose in on the thread side and assemble on the wall
lead-in of the concealed connection box (size 22).
Mount the flexible hose on the left-hand side of the wall lead-in of
the element using a compression fitting (size 19).
Repeat mounting on the right-hand side.
Preparing the washbasin element
=44,36 % von 1:1
22
22
19
Only for mounting support pro-
files
Handling
Viega Eco Plus washbasin element,
individually height-adjustable
18 from 37