
Push the wall lead-in back into the plastic clamp.
The long key surface (size 25) must face up or down.
If the wall lead-in snaps home into the groove, it has reached the
correct position.
Tighten the union nut.
Loosen (size 19) the flexible hose at the filling valve.
Open the corner valve.
Flush the pipeline.
Close the corner valve.
Mount (size 19) the flexible hose onto the filling valve.
Handling
Viega WC element
15 from 20
Содержание 8139
Страница 2: ...Viega WC element 2 from 20 ...