
10
FRONT FRAME
Locate the two silver coloured upright frame sections and the two curved frame rail sections. You will need
the 8 x LONGEST screws to join these sections together.
The inside facing edges of the rails will be tapered,
while the flat edge will meet the tray and the other will
be closest to the bathroom ceiling.
In turn, align the two holes in the uprights with the two
holes in the upper and lower curved rails. The screws
pass through the holes in the side of the upright and
fasten into the curved rail as shown in the diagram
DO NOT FULLY TIGHTEN THE SCREWS -
ALLOW SOME MOVEMENT IN THE FRAME FOR
INSTALLING THE FIXED GLASS
PLEASE NOTE: The uprights have 'cut out
sections' that go over the trays lip, therefore
these are positioned at the bottom
Longest Screws
R
ails maybe same size on most
models - This is for
illustration
only
How To Use PTFE Tape
Содержание Hydro Plus Series
Страница 1: ...Technical Support 01524 489939...
Страница 4: ......
Страница 5: ...Two flat static panels 17 This Shower requires 2 x 1 Metre Braided Hoses Not Supplied YOU WILL NEED...
Страница 6: ...You MUST register the product warranty within 90 days following delivery...
Страница 7: ......
Страница 8: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ...The shower is supplied with a 12 volt transformer that needs connecting to the mains...
Страница 34: ...01524 489939...