box there are three electronic main fuses F1/F2/F3/35A (this can differ from house to house, up to 3x
63A). L2 from the fuse will be connected to the ECOmulti input, L2 from the houses is connected to
the ECOmulti output. A transfer switch S1 with 35A is installed between input and output to close the
phase L2 in case of a ECOmulti failure. In normal operation this switch has to be open!
The photovoltaic energy (in this case 230VAC/12A from micro inverters) will be fed into the houses L2
phase on the output of the ECOmulti (=Hub2). An extra fuse F5/16A is protecting the solar system.
On the L2 output of the ECOmulti another electronic fuse 35A is mounted to prevent a damaged
ECOmulti in case of a shortcut in the house. For maintenance work on the ECOmulti the main fuse L2,
the output fuse L2 and the solar fuse 16A can be switched off.
Mounting the AC sensor
The AC sensor is needed for measuring the generated solar energy. The values of the sensor will be
displayed on the ColorControl GX and in the VRM portal. The sensor is not needed for controlling the
ECOmulti!