46.03
16398 Rev B Updated 04/2021 © 2021 Victaulic Company. All rights reserved.
5.0 PERFORMANCE (CONTINUED)
Hip Calculation FL-SA/GAP Sprinklers (Framing Members Parallel to Roof Slope) – Wet and Dry System
Calculation #1 – Hip Area
• Calculate all sprinklers within the hip area shown shaded. See Figure 22.
• Minimum sprinkler flow is 20 gpm per sprinkler.
FL-SA/GAP
FL-SA/DS
FIGURE 22: HYDRAULIC CALCULATIONS REQUIRED FOR RE @ HIP
(FRAMING MEMBERS PARALLEL TO SLOPE)
Hip Calculation FL-SA/DS Sprinklers (Framing Members Parallel to Roof Slope) – Wet and Dry System
Calculation #1 – Hip Area
• Calculate all sprinklers within the hip area shown shaded. See Figure 23.
• Minimum sprinkler flow is 20 gpm per sprinkler.
FL-SA/GAP
FL-SA/DS
FIGURE 23: HYDRAULIC CALCULATIONS REQUIRED FOR DS @ HIP
(FRAMING MEMBERS PARALLEL TO SLOPE)
21