background image

 

 

028-5011 

LIT-R820_REV2-E03 

 

24 Vac Power& Wiring  

   

 

 

 

 

 

 

 

 

 

It is not necessary to ground any leg of the transformer to earth with the controller card.  

 

The controller uses internally a half wave rectifier bridge. On 0 to 10 Vdc control signal, the reference of the control 
signal is the Common of the power supply of the SCR controller card. 

 

Use a Class 1 ( properly fused ) or Class 2,  CSA or UL recognized transformer. 

 

High voltage Wiring  

   

 

 

 

 

 

 

 

 

General cautions: 

 

 

High voltages are present on the terminals of these devices. Please read all the instruction in this manual carefully. 

 

The 45 & 75 Amps models need to be wired with the supplied high voltage lugs. 

Attach the wire to the lug first

and then screw the lug to the power module. 

 

Have the wiring done by a qualified and skilled professional. 

 

High voltage and amperage can be fatal. 

 

All wiring must conform to national electrical code regulations. 

 

The instrument must be wired before applying power. 

 

Protect circuits with semi conductor fuses. 

 

For in panel installation, derating amperage curves are available from the factory. 

 
 

Specifications  

   

 

 

 

 

 

 

  

 

Operating Conditions:  0°C to 80°C ( 32°F to 176°F ) / 0 % to 95 % R.H. non-condensing 

See power derating curves document

 

 

Thermostatic protection:  Self-resetting. Auto shut off when SCR ambient temp. is above 82°C ( 180°F ) 

 

 

Power supply:  24 Vac -15%, +10%  50/60 Hz; 2 VA 

Use a Class 1 ( properly fused ) or Class 2,  CSA or UL recognized transformer.  

 

Troubleshooting  

 

 

 

 

Check

Check general wiring, as per heater manufacturer diagram 

Be sure you understand the system and its normal operation 

Verify high voltage power supply wiring 

Verify that correct voltage is present at the heater with proper wire size 

Verify low voltage 24 Vac power supply wiring

24 Vac is present at terminals 1 & 2 of the R820 SCR 

Create or simulate 100 % heating demand

 Using present control system 

 

R820 Configured for 0 to 10 Vdc input signal

 

Signal between terminals 1 & 3 is 10 Vdc or superior 

 

Dip switch properly configured: S1=Off, S2=Off, S3=Off & S4=On 

 

Be sure that the polarity is correct and not re to +, - to - 

 

Red status LED on SCR is on 100 % of the time 

 

R820 Configured for 4 to 20 mA input signal

 

Signal between terminals 1 & 3 is 20 mA or superior 

 

Dip switch properly configured: S1=Off, S2=Off, S3=On & S4=Off 

 

Be sure that the polarity is correct and not re to +, - to - 

 

Red status LED on SCR is on 100 % of the time 

 

R820 Configured for 0 to 135 

Ω

 input signal 

 

Signal between terminals 1 & 3 is 135 

Ω

 or superior 

 

Dip switch properly configured: S1=On, S2=On, S3=Off & S4=Off 

 

Red status LED on SCR is on 100 % of the time 

Verify amperage consumption of the heater

Red status LED on SCR is on 100 % of the time 

Verify & correct 24 Vac power supply to the SCR

Verify low voltage fuses, protections, flow switch, etc……… 

Verify control wiring & control signal

Correct control signal is present at the SCR 

Check polarity of control signal 

Verify fuses & all protections & contact the heater manufacturer 

Viconics Electronics Inc.

  9245, Langelier Blvd, St-Leonard, Quebec, Canada H1P 3K9

 

www.viconics.com 

[email protected]

 

Important Notice:
 

These instruments have 
undergone rigorous tests 
and verifications prior to 
shipment to ensure 
proper and reliable 
operation in the field. 
However, like other such 
products, they are 
subject to failure. It is 
therefore the 
responsibility of the 
installer / user / electrical 
panel designer to 
incorporate safety 
features 

and 

devices   

( such as relays, flow 
switch, thermal 
protections, etc.. ) to 
protect the entire system 
from catastrophic failure.

Содержание R820 REV2 Series

Страница 1: ...mponent sourcing and matching for reliable operation They are compatible with many industry standard signals A typical application would be to control a modulating electric duct heater with a 0 to 10 Vdc control signal from an analog room thermostat The R820 power controller also contain four dip switch to adjust to the following control signals 0 to 10 Vdc control signal 2 to 10 Vdc control range...

Страница 2: ...t for proper heat dissipation 5 Do not relocate the power switching modules on the heatsink R820 Installation and Dimensions Mounting instructions templates are available from the factory The cutout templates include holes position for heatsink attachment to the electrical cabinet Single phase R820 will have 2 mounting screw 1 on each side Three phase R820 will have 4 mounting screw 2 on each side...

Страница 3: ...ch position S1 S2 S3 S4 0 to 10 Vdc control signal Off Off Off On 0 To 10 Vdc From a Building Automation System Dip switch position S1 S2 S3 S4 0 to 10 Vdc control signal Off Off Off On Modulating R oom Thermos tat 0 to 10 Vdc 0 to 10 Vdc Modulating S upply Air Control Thermos tat 0 to 10 Vdc Modulating S ignal From B AS S ys tem 1 2 3 Common 24 Vac 0 to10 Vdc output L1 2 Vdc 0 capacity 10 Vdc 100...

Страница 4: ...S2 S3 S4 4 to 20 mA control signal Off Off On Off Modulating R oom Thermos tat 0 to 135 Ohms 50 60 70 80 90 Modulating S upply Air Control Thermos tat 0 to 135 Ohms 50 60 70 80 90 4 to 20 mA Modulating S ignal From B AS S ys tem 1 2 3 L1 2nd S S R models only L2 L3 on 3 phase 0 Ohms 0 capacity 135 Ohms 100 capacity R W B 1 2 3 L1 2nd S S R models only L2 L3 on 3 phase 4 mA 0 capacity 20 mA 100 cap...

Страница 5: ...per wire size 3 Verify low voltage 24 Vac power supply wiring 24 Vac is present at terminals 1 2 of the R820 SCR 4 Create or simulate 100 heating demand Using present control system R820 Configured for 0 to 10 Vdc input signal Signal between terminals 1 3 is 10 Vdc or superior Dip switch properly configured S1 Off S2 Off S3 Off S4 On Be sure that the polarity is correct and not reversed to to Red ...

Отзывы: