![Viavi G3-GS-8P-96T Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/viavi/g3-gs-8p-96t/g3-gs-8p-96t_hardware-installation_1011836008.webp)
8 — © 2021 Viavi Solutions (1 Nov 2021)
inserting. When the server has been pushed completely into the rack,
the locking tabs should "click" into the locked position.
3.
If screws are used, tighten the screws on the front and rear of the outer
rails.
4.
(Optional) Insert and tighten the thumbscrews that hold the front of the
server to the rack.
How to remove the server from the rack
Caution:
It is dangerous for a single person to off-load the
heavy chassis from the rack without assistance. Be sure to have
sufficient assistance supporting the chassis when removing it
from the rack. Use a server lift.
1.
Pull the chassis forward out the front of the rack until it stops.
2.
Press the release latches on each of the inner rails downward
simultaneously and move the chassis forward in the rack.
Technical Support
Please contact technical support if your issues are not represented or you
need further help.
North America
+1 800 526 7919
South America
+1 800 526 7919
EMEA
+44 1 959 569 880
APAC
+44 1 959 569 880
All Other Regions
viavisolutions.com/contacts
America)
(EMEA/APAC)
Web page and
documentation
support
web link in your email)
Support hours are 7:00 A.M. to 7:00 P.M. CST/CDT (for North and
South America) and 8:00 A.M. to 5:00 P.M GMT (EMEA and APAC).