background image

G3-GS-8P-96T

Hardware Installation

1 Nov 2021

Содержание G3-GS-8P-96T

Страница 1: ...G3 GS 8P 96T Hardware Installation 1 Nov 2021 ...

Страница 2: ...20A BTU hr 2610 BTU hr Operational voltage 120V Power dissipation watts 765W Relative humidity non condensing 5 85 Temperature operating 50 F 95 F 10 C 35 C Temperature storage 4 F 149 F 20 C 65 C Compliance RoHS FCC CE 1 For SFP the SFP may be any of Copper 10 100 1000 1Gb SX LX For SFP the SFP may be any of 10Gb SR LR For QSFP the QSPF may be any 40Gb SR LR BiDi Universal For QSFP28 the QSFP28 t...

Страница 3: ...3 Quick start for experienced installers Quick start for experienced installers First time installers should use the information on the next page ...

Страница 4: ...ure card 9 If you are connecting to a network TAP sold separately a Connect the TX port from your server firewall router or switch to the Link A port on the TAP b Connect the TX port from your other switch to the Link B port on the TAP c Use two analyzer cables to connect the analyzer port on the TAP to the SFP transceivers in the capture card d If you have more than one TAP to connect repeat the ...

Страница 5: ...eded to set the IP address so you can disconnect them after the IP address is set The IP subnet and gateway or router addresses are available and known to you 1 Log in to the Windows operating system using the Administrator account and its default password admin You can change the Administrator account password after logging in See the Windows documentation if necessary 2 In Windows choose Start C...

Страница 6: ...assword is located on a sticker that is affixed to the body of the applicance The sticker looks very similar to this one 9 Choose Configuration Users and select the second user account ADMIN account 10 Click Modify User and change the password 11 Optional Set up alerts There is no audible alarm if there is an issue with a power supply unit Other alerting options are available Each must be configur...

Страница 7: ... inner rail onto the side of the chassis 4 Optional If desired secure the rail with two flat head M4 x 4mm screws and washers as illustrated 5 Repeat for the other inner rail 6 Identify the outer rack rails 7 Press upward on the locking tab at the rear end of the middle rail 8 Push the middle rail back into the outer rail 9 Hang the hooks on the front of the outer rail onto the square holes on the...

Страница 8: ...server lift 1 Pull the chassis forward out the front of the rack until it stops 2 Press the release latches on each of the inner rails downward simultaneously and move the chassis forward in the rack Technical Support Please contact technical support if your issues are not represented or you need further help North America 1 800 526 7919 South America 1 800 526 7919 EMEA 44 1 959 569 880 APAC 44 1...

Отзывы: