background image

8 — © 2021 Viavi Solutions (30 Apr 2021)

Caution: 

Do not pick up the server by the front

handles. They are designed to pull the system from a

rack only.

1.

Align the chassis rails with the front of the rack rails.

2.

Slide the chassis rails into the rack rails, keeping the

pressure even on both both sides. You may have to depress

the locking tabs while inserting. When the server has been

pushed completely into the rack, the locking tabs should

"click" into the locked position.

3.

If screws are used, tighten the screws on the front and rear

of the outer rails.

4.

(Optional) Insert and tighten the thumbscrews that hold

the front of the server to the rack.

How to remove the server from the rack

Caution: 

It is dangerous for a single person to off-load

the heavy chassis from the rack without assistance. Be

sure to have sufficient assistance supporting the chassis

when removing it from the rack. Use a server lift.

1.

Pull the chassis forward out the front of the rack until it

stops.

2.

Press the release latches on each of the inner rails

downward simultaneously and move the chassis forward in

the rack.

 

 

Technical Support

Please contact technical support if your issues are not

represented or you need further help.

North America

+1 800 526 7919

South America

+1 800 526 7919

EMEA

+44 1 959 569 880

APAC

+44 1 959 569 880

All Other

Regions

viavisolutions.com/contacts

Email

[email protected]

 (North/

South America)

[email protected]

 (EMEA/

APAC)

Web page and

documentation

support

[email protected]

 (Please

include the web link in your email)

Support hours are 7:00 A.M. to 7:00 P.M. CST/CDT (for North

and South America) and 8:00 A.M. to 5:00 P.M GMT (EMEA

and APAC).

    

Содержание Apex Enterprise

Страница 1: ...Apex Enterprise Hardware Installation 30 Apr 2021 ...

Страница 2: ...120V Power dissipation watts 370W Relative humidity non condensing 20 80 Temperature operating 50 F 95 F 10 C 35 C Temperature storage 4 F 149 F 20 C 65 C 1 If applicable mounted weight includes any rail kits 2 SFP may be any of Copper 10 100 1000 1Gb SX LX SFP may be any of 10Gb SR LR QSPF may be any 40Gb SR LR BiDi Universal Parts list Each appliance comes packed in a box or several boxes The bo...

Страница 3: ...3 Quick start for experienced installers Quick start for experienced installers First time installers should use the information on the next page ...

Страница 4: ...ur appliance remotely regardless of whether the appliance is powered on 6 Connect a monitor keyboard and mouse to the hardware appliance You can use a KVM switch if desired The KVM must be compatible with the operating system used on the appliance The user input devices or KVM switch are only temporarily needed to set the IP address so you can disconnect them after the IP address is set 7 Turn on ...

Страница 5: ...ght click ETH0 and choose Properties 4 Select Internet Protocol Version 4 TCP IPv4 and click Properties 5 Set the IP address subnet mask router or gateway and DNS server for your environment and click OK 6 Click OK again to close the Properties dialog for that network connection You interact with the hardware appliance through the Apex UI 1 Navigate to https hostname where hostname is the IP addre...

Страница 6: ...er account ADMIN account 10 Click Modify User and change the password 11 Optional Set up alerts There is no audible alarm if there is an issue with a power supply unit Other alerting options are available Each must be configured separately using details from your environment To receive email alerts change the settings at Configuration SMTP To receive SNMP traps change the settings at Configuration...

Страница 7: ... holes Make sure the rail faces outward so that it will fit with the rack s mounting bracket 3 Slide the rail toward the front of the chassis to hook the inner rail onto the side of the chassis 4 Optional If desired secure the rail with two flat head M4 x 4mm screws and washers as illustrated 5 Repeat for the other inner rail 6 Identify the outer rack rails 7 Press upward on the locking tab at the...

Страница 8: ...oad the heavy chassis from the rack without assistance Be sure to have sufficient assistance supporting the chassis when removing it from the rack Use a server lift 1 Pull the chassis forward out the front of the rack until it stops 2 Press the release latches on each of the inner rails downward simultaneously and move the chassis forward in the rack Technical Support Please contact technical supp...

Отзывы: