Chapter 2 - Installation
2.9 Recommended Installation Sequence
In order to ensure proper and trouble-free installation, the following
installation sequence is recommended:
1. Assembly of Mount
2. Assembly of Reflector
3. Installation of Feed
2.10 Recommended Torque Values
The following list contains the recommended torque values for all 4.5M
antenna fasteners. Refer to Table 2-2 for galvanized fasteners and Table 2-3
for stainless steel fasteners.
CAUTION
Do not torque any fasteners until specifically directed to torque
a fastener. As fasteners are installed, tighten finger tight only.
Table 2-2. Torque Values For Antenna Fasteners
(High Strength Grade 5 Zinc or Galvanized Steel)
Fastener Size
Torque (ft-lb) tolerance ±10%
1/4-20
6 (8 Nm)
5/16-18
15 (20 Nm)
3/8-16
30 (40 Nm)
1/2-13
75 (100 Nm)
3/4-10
250 (except as noted) (333 Nm)
1-8
600 (except as noted) (813 Nm)
42S199F
2-6
Содержание Series 8345
Страница 1: ...Series 8345 4 5 Meter Prime Focus Motorized Antenna Installation Manual Manual 42S199F March 2003 ...
Страница 8: ...Blank Page ...
Страница 21: ...Chapter 2 Installation Figure 2 2 Installation of Leg Support Bracket 42S199F 2 11 ...
Страница 22: ...Chapter 2 Installation Figure 2 3 Installation of Support Arms 42S199F 2 12 ...
Страница 27: ...Chapter 2 Installation Figure 2 6 AZ EL Assembly 4 5 Meter Motorized Sheet 2 of 5 482045B 42S199F 2 17 ...
Страница 28: ...Chapter 2 Installation Figure 2 6 AZ EL Assembly 4 5 Meter Motorized Sheet 3 of 5 482045B 42S199F 2 18 ...
Страница 29: ...Chapter 2 Installation Figure 2 6 AZ EL Assembly 4 5 Meter Motorized Sheet 4 of 5 482045B 42S199F 2 19 ...
Страница 30: ...Chapter 2 Installation Figure 2 6 AZ EL Assembly 4 5 Meter Motorized Sheet 5 of 5 482045B 42S199F 2 20 ...
Страница 44: ...Chapter 2 Installation Figure 2 14 Installation of Feed Housing and Orthomode Transducer 42S199F 2 34 ...
Страница 46: ...Chapter 2 Installation Figure 2 15 Installation of LNAs LNBs 42S199F 2 36 ...
Страница 47: ...Chapter 2 Installation Figure 2 16 Installation of LNA LNB Cover 42S199F 2 37 ...
Страница 57: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 1 of 10 367730 42S199F 2 47 ...
Страница 58: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 2 of 10 367730 42S199F 2 48 ...
Страница 62: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 6 of 10 367730 42S199F 2 52 ...
Страница 63: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 7 of 10 367730 42S199F 2 53 ...
Страница 64: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 8 of 10 367730 42S199F 2 54 ...
Страница 65: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 9 of 10 367730 42S199F 2 55 ...
Страница 70: ...Chapter 3 Operation Blank 42S199F 3 4 ...
Страница 76: ...Chapter 4 Maintenance Blank 42S199F 4 6 ...