![ViaSat Series 8345 Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/viasat/series-8345/series-8345_installation-manual_1011533015.webp)
Chapter 2 - Installation
2.8 Recommended Tools And Equipment
Table 2-1 lists the tools and equipment required for efficient and convenient
installation.
Table 2-1. Tools and Equipment Required For Installation
Quantity Description
1 Set
Combination wrenches 1/4-inch to 1 1/2-inch size including 15/16-inch
2 Each
Alignment pins 1/8-inch and 1/2-inch taper
1 Each
3/4-inch spud wrench
1 Each
3 lb. hammer
1 Each
Pry bar
1 Each
Band cutter
1 Each
12-foot stepladder
1 Each
6-foot stepladder
1 Each
Torque wrench, 7-9 ft-lbs (9-12 Nm)
1 Each
Torque Wrench, 15-20 ft-lbs (20-27 Nm) 1/4-inch to 3/8-inch drive
1 Each
Torque wrench, 150 ft-lbs (203 Nm)
1 Each
Torque wrench, 250-300 ft-lbs (333-400 Nm) 3/4-inch drive
1 Each
Small Allen wrench set
1 Each
Medium Allen wrench set
1 Each
Large Allen wrench set
1 Each
1/2-inch Allen wrench
1 Each
Torpedo level
1 Set
Electrical tools (screw drivers, nut drivers, pliers, crimp tool, line-man pliers, needle
nose pliers, channel lock pliers)
1 Set
3/8-inch drive ratchet set
1 Each
Grease gun with cartridges
1 Each
1/2-inch drive ratchet set with 15/16-inch socket and 3/4-inch deep well socket
1 Each
3/4-inch drive ratchet with a 1 1/8-inch, 1 1/4-inch, 1 1/2-inch, 1 7/8-inch sockets
and 6-inch extension
1 Each
Angle finder or magnetic base inclinometer
1 Each
1/4-inch diameter drill
1 Each
1/2 hp drill motor
42S199F
2-5
Содержание Series 8345
Страница 1: ...Series 8345 4 5 Meter Prime Focus Motorized Antenna Installation Manual Manual 42S199F March 2003 ...
Страница 8: ...Blank Page ...
Страница 21: ...Chapter 2 Installation Figure 2 2 Installation of Leg Support Bracket 42S199F 2 11 ...
Страница 22: ...Chapter 2 Installation Figure 2 3 Installation of Support Arms 42S199F 2 12 ...
Страница 27: ...Chapter 2 Installation Figure 2 6 AZ EL Assembly 4 5 Meter Motorized Sheet 2 of 5 482045B 42S199F 2 17 ...
Страница 28: ...Chapter 2 Installation Figure 2 6 AZ EL Assembly 4 5 Meter Motorized Sheet 3 of 5 482045B 42S199F 2 18 ...
Страница 29: ...Chapter 2 Installation Figure 2 6 AZ EL Assembly 4 5 Meter Motorized Sheet 4 of 5 482045B 42S199F 2 19 ...
Страница 30: ...Chapter 2 Installation Figure 2 6 AZ EL Assembly 4 5 Meter Motorized Sheet 5 of 5 482045B 42S199F 2 20 ...
Страница 44: ...Chapter 2 Installation Figure 2 14 Installation of Feed Housing and Orthomode Transducer 42S199F 2 34 ...
Страница 46: ...Chapter 2 Installation Figure 2 15 Installation of LNAs LNBs 42S199F 2 36 ...
Страница 47: ...Chapter 2 Installation Figure 2 16 Installation of LNA LNB Cover 42S199F 2 37 ...
Страница 57: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 1 of 10 367730 42S199F 2 47 ...
Страница 58: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 2 of 10 367730 42S199F 2 48 ...
Страница 62: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 6 of 10 367730 42S199F 2 52 ...
Страница 63: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 7 of 10 367730 42S199F 2 53 ...
Страница 64: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 8 of 10 367730 42S199F 2 54 ...
Страница 65: ...Chapter 2 Installation Figure 2 23 Motorized 4 5 Meter Ku Band Feed Assembly Sheet 9 of 10 367730 42S199F 2 55 ...
Страница 70: ...Chapter 3 Operation Blank 42S199F 3 4 ...
Страница 76: ...Chapter 4 Maintenance Blank 42S199F 4 6 ...