11
•
connection accessories for the shell installation
- nut M10
8 pcs
- washer 10,5
8 pcs
- connecting stud
4 pcs
- spring clip
4 pcs
- screw M5 x 12
4 pcs
- washer 5,3
4 pcs
- bushing HEYCO
3 pcs
- washer 5,3
4 pcs
- screw ST 4,2 x 9,5
6 pcs
•
cleaning tools (hook, brush with a handle, spike)
•
holder for cleaning tools
1 pc
•
manometer
1 pc
•
inlet and outlet cocks Js 1/2“
1 pc
•
turbulators
4 pcs
•
partitions in combustion space
4 pcs (7 sect. 5 pcs)
•
plug Js 6/4“ dummy
1 pc
•
setscrew of the throttle
1 pc
•
heating water flange G 1 1/2"
1 pc
•
return water flange G 1 1/2"with a sleeve piece Js 1/2“ for inlet and outlet cock 1 pc
•
sealing
φ
90 x 60 x 3
2 pcs
•
sealing
φ
60 x 48 x 2
1 pc
•
Cable clamp
4 pcs
•
Bulb for flue gas sensor
1 pc
•
capillary spring
1 pc
•
power flexible cord 4,5 m; CGLG 3Cx0,75
1 pc
•
mating connector GST 3G
1 pc
•
mating connector GST 749
3 pcs
•
handling key
1 pc
•
business technical documentation
Accessories delivered by request:
•
fuel reservoir 725 l
- the side of fuel reservoir
3 pcs
- the side of fuel reservoir with the hole for spiral worm
1 pc
- the foot of fuel reservoir
4 pcs
- the bottom of fuel reservoir
2 pcs
- the bottom of fuel reservoir A
2 pcs
- the cover of fuel reservoir
1 pc
- handle
1 pc
•
connection accessories for fuel reservoir assembly
- pendant chainlet
1 pcs
- screw M6 x 12
72 pcs
- washer 6,4
72 pcs
- nut M6
72 pcs
- screw M6 x 16
2 pcs
- washer 8,4
2 pcs
The boiler equipment delivered “by request“ is not included in the basic price of boiler
5.4
Assembly procedure
5.4.1 Boiler drum installation
1. Put the boiler drum on the supporting brickwork.
2. Mount the plug Js 6/4“ (1 pc) including sealing
φ
60 x 48 x 2 (1 pc).to the front section
3. Insert the sealing
∅
90 x 60 x 3 on the upper flanged part of the rear boiler section and bolt the flange of
heating water and connect the other end with the heating system.
4. Insert the sealing
∅
90 x 60 x 3 on the bottom flanged part of the rear boiler section and bolt the flange of
return water with a sleeve for the filling and discharge cock and connect the other end with the heating
system.
5. After the boiler connection to the heating system screw the filling and discharge valve into the return water
flange sleeve.
6. Put the smoke pipe on the smoke extension piece and insert it into the chimney hole.
Содержание Woodpell
Страница 1: ...Hercules U26 Návod k obsluze Woodpell MANUAL FOR BOILER OPERATION AND INSTALLATION ...
Страница 38: ...38 ...
Страница 40: ...40 Update 17 2013 GB ...