background image

 

23

4.  Children should be supervised in order to ensure that they do not play with the appliance. 

5.  If there is a risk of rise and getting away of flammable steams or gas into the boiler room or at 

operations by which there is an intermediate risk of fire or blast (sticking of floor coverings, 
paintings with flammable colours), the furnace must be disabled from operation before the 
beginning of operations. 

6.  Using of flammable liquids is DISALLOWED for firing the VIADRUS U 22 C furnace. 

7.  It is DISALLOWED to overheat the furnace during its operation. 

8.  Objects of flammable materials must not be put on the furnace and to a distance smaller than 

that of a safety distance from it 

9.  Flammable materials must not be in the minimal distance of 1500 mm from the furnace when 

emptying the ash at the VIADRUS U 22 C furnace. 

10. The space at the point of choking valve rotation of the ashtray door must be cleaned in case of 

clogging with fuel, ashes or other impurities in order to avoid its rubbing thus wrong functioning.  

11. When the furnace operates at a lower temperature than of 60 °C the retting, or the so called low – 

temperature rust, of the boiler drum may occur that reduces the operating life of the boiler drum. 
Therefore we recommend to operate the furnace at a temperature of 60 °C or higher. 

12. After finishing of the heating period it is necessary to properly clean the furnace, smoke stack 

and chimney – pot. The fulcrum pin, smoky flap mechanism and other movable parts to be 
covered with graphite grease. And the boiler room to be kept clean and dry. 

 
 

9.   Maintenance 

  

1.  The ash from the ashtray to be emptied during the operation of the furnace even several times per day 

according to the sort of used fuel because a full ashtray hampers the right distribution of the burning air 
under the fuel and causes unequal burning process of fuel on the grate. All remains in the firebox 
especially the clinker are removed before each new burning up and at morning furnace operation 
reconditioning. The ash is needed to be put away into the fire – resistant tanks with a cover. 

It is 

necessary to use protective facilitations and to pay attention to personal safety while operating.

  

2.  The boiler walls inside the firebox, smoky furnace draughts and smoky chimney – pot to be cleaned  

1x per month if heating with coke. The cleaning to be performed 1x per week when heating with 
anthracite. 

3.  If there is a settlement of tar silt on the walls of the burning space while using fuels with higher gas build 

– up it can be removed with a scraper or by burning out with a help of dry wood (eventually coke) when 
setting the furnace to the maximum operating temperature. 

 
 

10.   Instructions for product liquidation after its operating life 

 

ŽDB GROUP a.s., is contractual partner of firm EKO – KOM a.s. with client number EK – F00060715. 

The

 

packages comply with EN 13427. 

 

With respect to the fact that the product is designed out of common metal materials the individual parts are 
recommended to be liquidated in the following manner: 

-

 

exchanger (grey cast iron), by a company engaged in salvage and liquidation of waste 

-

 

tube distributions, jacketing, by a company engaged in salvage and liquidation of waste 

-

 

other metal parts, by a company engaged in salvage and liquidation of waste 

-

 

ROTAFLEX and IZOBREX sealing materials in common waste 

 

We recommend to dispose the packages in the following way: 

plastic foil, cardboard cover, use a salvage point  

metal strapping tape, use a salvage point  

-  wooden base, is designated for a single usage and no longer can be used as a product. Its disposal is 

subject to Act. 477/ 2001 Sb. a 185/2001 Coll.as amended.  

 

In case that the product has lost its manufacture qualities there can be taken the advantage of 

product taking back (if this is established), in case that the originator has declared that this is a 
waste and it must be handled according to the valid legislation of the relevant country.  

Содержание ules U26

Страница 1: ...Hercules U26 Návod k obsluze VIADRUS U 22 C D MANUAL FOR BOILER OPERATION AND INSTALLATION ...

Страница 2: ...r 12 5 2 Delivery and accessories 12 5 3 Assembly techniques 13 5 3 1 Boiler drum installation 14 5 3 2 Jacket assembly 15 6 Putting into operation instructions for a contractual service organization 21 6 1 Control operation before starting 21 6 2 Putting the furnace into operation 21 6 3 Furnace transformation from solid fuels to gas and liquid fuels and retroactively 21 7 User s furnace service ...

Страница 3: ...n logs the heat work difficulty is considerably reduced and the service quality is increased The amount of ash is also substantially smaller and it is possible to further use it as fertilizer Advantages of the furnace 1 High operating life of cast iron exchanger and all other parts with respect to the quality of used materials 2 Design approved in the long term 3 Elaborate production technology on...

Страница 4: ...r DN 50 returnable water DN 50 Chart Nr 3 Heat technical parameters of the furnace at COKE and ANTHRACITE burning granularity 30 60 mm heating value 26 30 MJ kg 1 Section number 2 3 4 5 6 7 8 9 10 Rated power kW 11 7 17 7 23 3 29 1 34 9 40 7 46 5 52 3 58 1 Efficiency 75 80 Orientation fuel consumption coke kg h 1 1 89 2 87 3 77 4 71 5 65 6 59 7 53 8 47 9 41 Heating value coke MJ kg 1 27 8 Orientat...

Страница 5: ...of the VIADRUS U 22 C furnace Size of the furnace in sections 2 3 4 5 6 7 8 9 10 Medium section with a molding 1 2 3 4 4 5 5 6 Medium section without a molding 1 1 2 2 At the VIADRUS U 22 D furnace three types of medium sections are used in the front part of the furnace except the four section size there is a section with a recess for easier fuel inserting to the average up to 220 mm then sections...

Страница 6: ...ky channel width mm Barrier number pieces 2 12 2 3 24 2 4 36 2 5 48 2 A thermomanometer in the control box serves as an associated device for measuring the temperature of the heat water and water pressure in the heat system The sump of the thermomanometer sensor is located in the upper part of the back boiler section 1 Front section U 22C 2 Middle section with a strip 3 Rear section 4 Plug 5 Inser...

Страница 7: ... Middle section with a cutout 3 Middle section with a strip 4 Rest section 5 Plug 6 Insert 7 Anchor bolt 8 Sealing 9 Clack valve of the thermomanometer 10 Thermostat well Fig no 3 Diagram of VIADRUS HERCULES U 22 D boiler drum ...

Страница 8: ... bar 7 Slant bushing 8 Suspension pin 9 Sealing Ø 90 x 60 x 3 10 Choker screw 11 Label of smoke flap control 12 Plastic ball M10 13 Front draught controller 14 Filling and draining cock 15 Bushing HEYCO 16 Blind flange 19 17 Blind flange 15 9 18 Washer 10 5 19 Nut M10 20 Washer 5 3 21 Screw M5 x 12 22 Lock 2 5 x 20 Fig no 4 Assembly of VIADRUS HERCULES U 22 boiler with the box ...

Страница 9: ...bushing 7 Suspension pin 8 Sealing Ø 90 x 60 x 3 9 Choker screw 10 Label of smoke flap control 11 Plastic ball M10 12 Front draught controller 13 Filling and draining cock 14 Thermomanometer 15 Bushing HEYCO 16 Blind flange 19 17 Blind flange 15 9 18 Washer 10 5 19 Nut M10 20 Lock 2 5 x 20 Fig no 5 Assembly of VIADRUS HERCULES U 22 boiler without the box ...

Страница 10: ...ressure steam boilers ČSN 07 0245 Warm water and law pressure steam boilers Warm water boilers up to 50 kW output ČSN 07 7401 Water and steam for thermal energy equipments with working pressure up to 8 MPa b to the chimney ČSN 73 4201 Chimneys and flue gas ducting designing implementation and connection of fuel consumers c regarding the fire regulations ČSN 06 1008 Fire safety of heat installation...

Страница 11: ...ility level selection from EN 13 501 1 A fire resistant granite sandstone concrete bricks ceramic tiles mortars fire plasters B hard flammable acumin isumin cement bonded board lignos boards and basalt felts boards out of fibreglass C1 heavily flammable beech wood oak hobrex boards plywoods wersalite formica sirkolit C2 medium flammable pine wood larch spruce wood chip and cork boards rubber floor...

Страница 12: ...accessories for the VIADRUS U 22 furnace cleaning tools hook brush with shaft point hanger control box 1 piece thermomanometer 1 piece impregnating and clearing plug Js 1 2 1 piece draught regulator complete 1 piece closure Js 6 4 2 pieces rod with a control handle of the smoky flap 1 piece control label of the smoky flap 1 piece stifling screw 1 piece connecting pin of the jacket 4 pieces fan sha...

Страница 13: ...13 5 3 Assembly techniques Fig no 8 Connecting dimensions of VIADRUS HERCULES U 22 boiler without the control box Fig no 9 Connecting dimensions of VIADRUS HERCULES U 22 boiler with the control box ...

Страница 14: ...ibution of the returnable water in advance 4 An elbow with an impregnating and clearing plug to be screwed to the flange socket of the returnable water after connection of the furnace to the heat system 5 To put the stove pipe to the smoky chimney pot and penetrate it into the chimney hole 6 To screw the draught controller to the hole in the upper part of the front section 7 Two holes with a Js 6 ...

Страница 15: ...pper anchor screw and screw them by means of two nuts M10 6 and two washers 10 5 5 see Fig no 11 Fig No 11 Assembly of jacket consoles 4 Mount two connecting plugs 2 on the right side part of the jacket 1 and then insert the insulation Put the jacket on the lower anchor bolts and connect upper part with consoles 1 and 2 by means of two screws M5 x12 plus two washers 3 see Fig no 12 Fig No 12 Right...

Страница 16: ...ns of screws ST 4 2 x 9 5 10 Fig no 15 15 Fig no 18 Mounting of the upper part of the jacket in case of boiler without the control box see Fig no 14 1 Mount four spring clips 2 on the upper part of the jacket 1 and insert the thermomanometer 8 Fig no 15 Fig no 14 Upper part of the jacket in case of boiler without the control box 2 Insert the thermometer sensors into thermometer well and screw the ...

Страница 17: ...art of the jacket 5 Screw M5 x 12 6 Washer 5 3 7 Upper part of the jacket 8 Thermomanomater 9 Rear part of the jacket 10 Screw ST 4 2 x 9 5 11 Bushing HEYCO 12 Slant bushing 13 Blind flange 15 9 3 ks 14 Blind flange 19 1 ks Fig no 15 Jacket assembly of the boiler without the box ...

Страница 18: ...mometer sensors into the thermometer well and screw the manometer sensor into the manometer well 4 Insert the insulation into the upper part of the jacket and put the whole assembly on the boiler 5 Put and screw the upper part of the control box 5 by means of four screws ST 4 2 x 9 5 6 Complete the smoke flap kontrol according to Fig No 19 Fig no 16 Mounting of the control box Fig no 17 Upper part...

Страница 19: ...14 Rear part of the jacket 15 Screw ST 4 2 x 9 5 16 Bushing HEYCO 17 Slant bushing 18 Blind flange 15 9 3 ks 19 Blind flange 19 1 ks Fig no 18 Jacket assembly of the boiler with the box Mounting of the draw barof smoke flap control 1 Complete the smoke flap control according to Fig no 19 2 Fasten the smoke flap control draw bar 2 to the smoke flap 1 by means of lock 2 5 x 20 3 3 Screw the plastic ...

Страница 20: ...nsive tank allow direct contact of the heat water with atmosphere In the heat period the expansive water in the tank absorbs oxygen that increases the rust effects and at the same time a considerable vaporization of water occurs Only water adjusted to values according to ČSN 07 7401 can be used for fill up The heat system is needed to be rinsed so as all impurities have been washed out During heat...

Страница 21: ... at contractual service company organization approved for performing the operation that provides him with performance of such transformation with an appropriate operating test Parts for transformation are delivered by the producer 7 User s furnace service COKE ANTHRACITE The optimal fuel is coke with granularity of 40 60 mm but it is possible to burn even coke and anthracite with granularity of 20...

Страница 22: ...qually high along the entire furnace depth 3 When using the anthracite it is necessary the air rose of the secondary air input in the stoker hole to be partly opened for the whole time of the build up of gases and flames out of freshly fed fuel the air rose of the secondary air input with regard to the surface temperature is necessary to be controlled with an instrument 4 At change over to night s...

Страница 23: ... the grate All remains in the firebox especially the clinker are removed before each new burning up and at morning furnace operation reconditioning The ash is needed to be put away into the fire resistant tanks with a cover It is necessary to use protective facilitations and to pay attention to personal safety while operating 2 The boiler walls inside the firebox smoky furnace draughts and smoky c...

Страница 24: ...as the Warranty card For an eventual jacket reclamation is the customer obliged to submit a packing label of the boiler jacket It is placed on the cardboard in which the jacket is expedited The user is obliged to perform a regular control of the furnace see Chapter 9 Failing to keep the mentioned instructions the warrants provided by the producer are not granted Each notice of defect must be made ...

Страница 25: ...sure recyclability in all term sof the standard for the functional packaging unit EN 13430 2000 YES 3 2 Recovery in the form of energy ensure that calorific gain is achievable for the functional packaging unit EN 13431 2000 YES Iron NO 3 3 Recovery by composting ensure compost ability in all terms of the standard for the functional packaging unit EN 13432 2000 NO NOTE Conformity with EN 13427 requ...

Отзывы: