18
Mounting of the upper part of the jacket in case of the boiler with the control box(see Fig.no.16):
1. Connect the front and rear part of the lower part of the control box by means of two consoles (2) and four
screws M5 x 10 (3).
2. By means of four screws M5 x 12 screw the lower part of the control box to the upper part of the jacket
(1 – Fig. No. 17).
3. Insert the thermomanometer and slip the capillaries through the hole in the lower part of the control box.
Insert the thermometer sensors into the thermometer well and screw the manometer sensor into the
manometer well..
4. Insert the insulation into the upper part of the jacket and put the whole assembly on the boiler.
5. Put and screw the upper part of the control box (5) by means of four screws ST 4,2 x 9,5.
6. Complete the smoke flap kontrol according to Fig. No.. 19
Fig. no. 16 Mounting of the control box
Fig. no. 17 Upper part of the jacket in case of the boiler with the control box
1. Upper part of the jacket
2. Spring
clip
1
Lower part of the control box
2
Console of the control box
3
Screw M5 x 10
4
Bushing SB 2-25-29
5
Upper part of the control box
6
Screw ST 4,2 x 9,5
7 Thermomanometer