General Information
18
4.4
A diagram showing flue gas flow in the exchanger
Fig.
№
. 8
A diagram showing flue gas flow in the exchanger
4.5
Delivery and Accessory
The VIADRUS K4 boiler is delivered as assembled on a pallet, packed in a carton cover. Flue gas ducting is delivered in accordance with the
customer requirements based on the actual connection of air inlet and flue gas outlet (see chapter 11).
Standard accessory for all boiler versions:
Mounting bracket
1 pc
Dowel - 8 x 40 mm
5 pcs
Bolt - 5 x 40
5 pcs
Chimney opening reducer piece
1 pcs
External sensor
1 pc
Screening (for changing-over to propane)
1 pc
Blinding plug D80
1 pc
Operation and installation manual, including the warranty certificate
For version VIADRUS K4G3HXXXX:
sensor QAZ 36.526/109
1 pc
Recommended accessory for all boiler versions:
Room thermostat
1 pc
ALMEVA flue gas ducting, Type: LIK, STAR or FLEX
Water filter
Opentherm (Honeywell CR 04 or CR 05)
The recommended accessory is not included in the boiler standard price.
4.6
Instructions before Putting into Operation
The boiler can only be commissioned by organizations that are authorized and trained for this purpose by the manufacturer.
The installation shall comply with the regulations that are applicable for this equipment. The boiler shall be compatible with the local connecting
conditions (checking the parameters of the boiler with the information on the name plate).
During the first start of operation of the boiler it is necessary to instruct the user in accordance with this manual and to hand over this
manual to the user.
Then it is necessary to perform:
-
inspection revision before commissioning,
-
inspection for any water leakages,
-
inspection of instrumentation and safety controls.
Notice:
The ABS boiler cover is protected by a protection foil. This foil needs to be removed before commissioning of the boiler or 1 month
from unpacking the boiler from the packaging carton at the latest. Removing the foil after this period may be more difficult.
first heat exchange
water output 50°C
water input
30°C
flue gas after water
condensation
condensation partition
condensate outlet
water output
water input
condensate
gor
ą
ce spaliny gazu
hot flue gas
flue gas after the first heat exchange
flue gas after the second heat exchange
burner
40 °C
Содержание NAOS K4
Страница 1: ...VIADRUS K4 Manual for boiler operation and installation GB_2015_31 GB_2017_24 ...
Страница 52: ...Servicing 52 ...
Страница 54: ......
Страница 55: ......
Страница 56: ...VIADRUS K4 VIADRUS a s Bezručova 300 CZ 735 81 Bohumín E mail info viadrus cz www viadrus cz ...