
Content
p.
1
Boiler Use and Advantages ...................................................................................................................................................................... 3
2
Technical parameters of the boiler ........................................................................................................................................................... 3
3
Description ............................................................................................................................................................................................... 5
3.1
Boiler Construction............................................................................................................................................................................. 5
3.2
Regulation and safety elements ......................................................................................................................................................... 6
3.3
Device for removing excess heat ....................................................................................................................................................... 6
3.4
Equipment for heat exhausting – accumulating reservoir ................................................................................................................... 8
4
Location and installation ........................................................................................................................................................................... 8
4.1
Regulations and guidelines ................................................................................................................................................................ 8
4.2
Placement options ............................................................................................................................................................................. 9
5
Delivery and installation ......................................................................................................................................................................... 10
5.1
Delivery and accessories ................................................................................................................................................................. 10
5.2
Installation procedure ....................................................................................................................................................................... 10
5.2.1
Installation of boiler drum ........................................................................................................................................................... 10
5.2.1.1
Installation of boiler drum – after-cooling loop ................................................................................................................... 10
5.2.1.2
Installing the boiler drum – two-way safety valve DBV 1 - 02 ............................................................................................ 11
5.2.1.3
Location of the assembly of ceramic inserts, the secondary air nozzle, the inclined grate (fig. no. 15) .............................. 11
5.2.2
Shell installation ......................................................................................................................................................................... 12
5.2.3
Draught regulator ....................................................................................................................................................................... 14
5.2.4
Cleaning tool mounting .............................................................................................................................................................. 14
5.2.5
Filling the heating system with water .......................................................................................................................................... 14
6
Putting into operation – instructions for contractual service organization ................................................................................................ 15
6.1
Verification activities before start-up ................................................................................................................................................. 15
6.2
Putting into operation ....................................................................................................................................................................... 15
7
Boiler operation by user ......................................................................................................................................................................... 15
7.1
Firing ............................................................................................................................................................................................... 16
7.2
Operation ......................................................................................................................................................................................... 17
8
Maintenance .......................................................................................................................................................................................... 17
9
IMPORTANT NOTICE............................................................................................................................................................................ 18
10
Instructions for the product disposal after its useful life period ................................................................................................................ 18
11
Warranty and liability for defects ............................................................................................................................................................ 19
12
Product fiche .......................................................................................................................................................................................... 20