29
Annex to the warranty certificate for customer - user
A record of warranty and after-warranty repairs and regular annual product inspections
Record
date
Carried out activity
Contracting service
organization
(signature, stamp)
Customer
signature
Страница 1: ...VIADRUS CLAUDIUS K 2 Manual for boiler operation and installation GB_2016_35 GB_2016_43...
Страница 2: ...m and filling with water 15 7 2 Gas connection 16 7 3 Connection to the mains 16 7 4 Condensate drain 16 7 5 Flue gas exhaust 16 7 6 Pressure losses of flue gas exhaust components for the boiler VIADR...
Страница 3: ...for heating of houses recreation facilities and also for reconstruction of heat sources in individual flats Heat output of the condensing boiler is 3 8 to 24 kW K 2 L3X and 7 8 to 48 1 kW K 2 L5X The...
Страница 4: ...condensate outlet mm 25 25 safety valve outlet Js 3 4 3 4 gas inlet Js 3 4 3 4 Supply voltage 1 N PE 230 VAC 50 Hz TN S Input power including pumps W 110 110 El protection IP 41 41 Tab 2 Heat technic...
Страница 5: ...temperature mode 4 87 6 At 30 of rated heat output and low temperature regime P1 4 3 kW At 30 of rated heat output and low temperature regime 1 97 6 Consumption of auxiliary electrical power Other it...
Страница 6: ...temperature mode 4 87 8 At 30 of rated heat output and low temperature regime P1 8 8 kW At 30 of rated heat output and low temperature regime 1 97 8 Consumption of auxiliary electrical power Other it...
Страница 7: ...controlled equithermally it is necessary to connect the outdoor sensor In this case we recommend using one of the communication devices see chap 6 3 To increase the number of heating circuits expansio...
Страница 8: ...is equipped with an additional anticorrosive device in the form of a magnesium anode whose function is based on the utilization of the electrochemical potential difference between the anode and the ta...
Страница 9: ...entral heating circulation supply return pipeline R 3 4 E socket heating coil R 5 4 Sensor housing R 3 8 Thermometer internal thread 1 2 Water drain 3 4 Magnesium anode An stopper 2 Weight empty kg 57...
Страница 10: ...Selection and erection of electrical equipment Common rules CSN 33 2000 7 703 ed 2 Electrical installations of buildings Part 7 703 Requirements for special installations or locations Rooms and cabins...
Страница 11: ...ards wood and fibreboards plastics flooring materials the safe distance is doubled it means that the distance is 400 mm The safe distance is to be doubled also in case when the fire reaction class is...
Страница 12: ...ng to the project K 2 L3X K 2 L5X L mm 502 587 L1 mm 213 5 293 5 L2 mm 105 5 183 5 V1 mm 426 440 diam D mm 80 110 Fig 6 Rear view of the boiler 1 Heating water outlet from the boiler if a water heater...
Страница 13: ...mperature sensor input B9 External temperature sensor B38 HW temperature sensor input BTr Room thermostat E1 Kindling electrode E2 Monitoring electrode MV1 Fan MV1 Fan Q1 Pump X1a Power supply connect...
Страница 14: ...ector 230 X1b Three way valve and selected output connector X1f Fan and pump power supply connector X2 Kindling transformer and gas valve connector X4 Temperature sensors and Reset button connector X5...
Страница 15: ...ption Before filling the system with water shift a three way valve control lever into the intermediate position using a screwdriver or manually by pulling it toward yourself slightly down if the boile...
Страница 16: ...he boiler commissioning check whether the condensate is drained Size of a waste PVC pipe is of 16 mm The condensate pH is 4 5 and it can be drained into the sewer system without treatment The boiler c...
Страница 17: ...h a special liner intended for the condensation boiler and a condensate drain from the chimney For the boiler it is possible to use a plastic liner with the temperature resistance of 120 C Version C8...
Страница 18: ...d calculation of the relevant flue gas exhaust 7 7 Boiler commissioning The entire installation must comply with regulations related to this equipment The boiler must be compatible with local connecti...
Страница 19: ...the flue gas which must be in the range of 8 4 to 8 8 The recommended value is 8 5 7 Wait about 120 seconds until the boiler operation gets stabilized and check or adjust the CO2 max value using the C...
Страница 20: ...e selected parameter value A B C H D E F G I J Fig 13 A Operation mode switch FV OFF ON for the HW heating B RESET button burner fault unblocking press for about 3 s C ESC button returning one step ba...
Страница 21: ...s 1 Time 00 00 23 59 hh mm 1 Date 01 01 31 12 dd MM 5 Summer time start 25 03 01 01 31 12 dd MM 6 Summer time end 25 10 01 01 31 12 dd MM Current date and time must be set due to the correct function...
Страница 22: ...0 00 00 24 00 hh mm 602 Mo Su 1 Phase OFF 22 00 00 00 24 00 hh mm 603 Mo Su 2 Phase ON 24 00 00 00 24 00 hh mm 604 Mo Su 2 Phase OFF 24 00 00 00 24 00 hh mm 605 Mo Su 3 Phase ON 24 00 00 00 24 00 hh m...
Страница 23: ...Fig No 18 Summer winter automatic temperature limit for switching between summer and winter mode Req T Run up Room Thermostat the temperature to which the boiler will heat when the outside sensor is n...
Страница 24: ...on In case of recurrence of the error contact service 8 5 Faults Fault Reason Solution The boiler does not ignite No voltage at the boiler Check whether the power cord is plugged in and whether there...
Страница 25: ...hrough the burner chamber leave for 10 min and rinse with clean water Any impurities will be discharged through a siphon 10 Install the burner plate by means of 4 nuts and washers M6 connect the fan c...
Страница 26: ...eriod it is necessary to add to the system a manufacturer approved antifreeze for this type of boiler or drain the system to avoid freezing of the heating system and the boiler For the boilers with fl...
Страница 27: ...Performance of regular service inspections within the range specified by the manufacturer by a service company with a valid service certificate For an eventual housing complaint the customer is oblig...
Страница 28: ...aging unit EN 13429 NO 3 1 Recovery by material recycling ensure recyclability in all terms of the standard for the functional packaging unit EN 13430 YES 3 2 Recovery in the form of energy ensure tha...
Страница 29: ...nty certificate for customer user A record of warranty and after warranty repairs and regular annual product inspections Record date Carried out activity Contracting service organization signature sta...
Страница 30: ...30...
Страница 31: ...31...
Страница 32: ...VIADRUS CLAUDIUS K 2 VIADRUS a s Bezru ova 300 E mail CZ 735 81 Bohum n info viadrus cz www viadrus cz...