background image

Table of Contents 

Rev. 10/30/2020 

WTJ-20 MANUAL 

Table of Contents 

Copyright 2020 Vestil Manufacturing Corp. 

Page 5 of 11 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WTJ-20-3-AC & WTJ-20-4-AC EXPLODED VIEW AND BILL OF MATERIALS (28-006-112)

 

 

 

 

Item  Part no.  Description 

Qty. 

 

28-514-091 

28-514-267 

Frame, weldment, mast receiver 

WTJ-20-3-AC & WTJ-20-4-AC 

WTJ-20-3-AC-GAL & WTJ-20-4-AC-GAL 

 

28-514-092 

28-514-268 

Frame, weldment, mast 

WTJ-20-3-AC & WTJ-20-4-AC 

WTJ-20-3-AC-GAL & WTJ-20-4-AC-GAL 

 

28-514-100 

28-514-269 

28-514-093 

 

Weldment, inner boom 

WTJ-20-3-AC 

WTJ-20-3-AC-GAL 

WTJ-20-4-AC 

WTJ-20-4-AC-GAL 

 

28-514-099 

28-514-094 

Weldment, outer boom 

WTJ-20-3-AC & WTJ-20-3-AC-GAL 

WTJ-20-4-AC & WTJ-20-4-AC-GAL 

5  28-112-042  Pin, 

1

/

2

”x1

1

/

2

” retaining clevis, zinc plated 

6  28-027-004  Pulley, tear drop 

7  28-158-001  120V AC winch with clutch 

8  33-112-034  Clevis pin, zinc plated, 

3

/

4

”x3

3

/

4

” 

9  99-112-057  Pin, height adjustment, 

3

/

4

” 

10  99-027-003  Pulley, cable 

11  08-025-007  Knob, 

3

/

8

”-16UNCx1

1

/

4

” 

12  08-145-037  1-ton capacity clevis hook 

13 

37021 

Nylon insert lock nut, Gr. 2, zinc finish, 

5

/

16

”-18 

14 

11059 

Bolt, 

5

/

16

”-18UNC x 1

1

/

2

”, zinc plated, #2 

15 

33008 

Flat washer, zinc plated, USS, 

3

/

8

”  

16 

11103 

Hex bolt, Gr. A, zinc plated, 

3

/

8

” – 16 x 

3

/

4

” 

17 

33622 

Split lock washer, carbon steel, medium zinc 

finish, 

3

/

8

” 

18 

45286 

#11 hitch pin clip, 

1

/

8

”x2

5

/

8

” 

19 

65076 

1

/

8

”x1” cotter pin, zinc plated 

 

Diagram of Fixed Installation 

(not mounted to vehicle) 

Step 1: Create a foundation for the jib. The necessary 

minimum foundation requirements appear in the diagrams. 

When the foundation is adequately cured, install 

7

/

8

” jam nuts 

on each anchor bolts. Wind them to the surface of the 

foundation. Level across opposite jam nuts by raising or 

lowering specific nuts until all of the nuts are level. Then, fill 

the center of the bolt pattern (see below “Overhead View of 

Foundation” diagram) with grout, e.g. Morta Mix. The top of 

the grout pedestal should be level with the tops of the jam 

nuts. 

 

 

 

Step 2: Set the crane on the foundation. Align the bolt holes 

in the mounting plate with the anchor bolts and carefully 

lower the mast onto the leveling nuts. Install 

7

/

8

” lock nuts on 

the anchor bolts but leave them loose. Plumb the mast at 90° 

increments, i.e. check the vertical levelness of the mast at 4 

locations equally spaced around the circumference of the 

mast. Adjust the leveling nuts to fine tune levelness; then 

tighten the lock nuts against the mounting plate. 

 

Содержание WTJ-20 Series

Страница 1: ...ent parts labels and accessories call our Technical Service and Parts Department at 260 665 7586 The department can also be contacted online at http www vestilmfg com parts_info htm Electronic copies of Instruction Manuals Additional copies of this instruction manual may be downloaded from https www vestil com page manuals php Table of Contents Page Specifications 2 3 Exploded Views Bills of Mater...

Страница 2: ... 545 5kg WTJ 20 4 DC Capacity 2 000 lb 909 1kg Net weight 243 lb 110 5kg 12V DC powered winch with handheld pendant controller 3 16 x 46 long cable with hook 4 7mm x 116cm Capacity 2 000 lb 909 1kg Net weight 256 lb 116 4kg 12V DC powered winch with handheld pendant controller 3 16 x 46 long cable with hook 4 7mm x 116cm Boom position Boom fully retracted Boom in second position Boom in third posi...

Страница 3: ... 272 7kg C 1250 lb 568 2kg 950 lb 431 8kg 780 lb 354 5kg D 2000 lb 909 1kg 1500 lb 681 8kg 1200 lb 545 5kg WTJ 20 4 AC Capacity 2 000 lb 909 1kg Net weight 375 lb 170 5kg 12V DC powered winch with handheld pendant controller 3 16 x 46 long cable with hook 4 7mm x 116cm Boom position Boom fully retracted Boom in second position Boom in third position Boom fully extended A 1100 lb 500 kg 800 lb 363 ...

Страница 4: ... finish 5 16 18 5 14 11059 Bolt 5 16 18UNC x 1 1 2 zinc plated 2 5 15 33006 Flat washer zinc plated USS 5 16 4 16 45286 11 hitch pin clip 1 8 x2 5 8 3 17 65076 1 8 x1 cotter pin zinc plated 1 Diagram of Fixed Installation not mounted to vehicle Step 1 Create a foundation for the jib The necessary minimum foundation requirements appear in the diagrams When the foundation is adequately cured install...

Страница 5: ... 2 1 15 33008 Flat washer zinc plated USS 3 8 3 16 11103 Hex bolt Gr A zinc plated 3 8 16 x 3 4 3 17 33622 Split lock washer carbon steel medium zinc finish 3 8 3 18 45286 11 hitch pin clip 1 8 x2 5 8 3 19 65076 1 8 x1 cotter pin zinc plated 1 Diagram of Fixed Installation not mounted to vehicle Step 1 Create a foundation for the jib The necessary minimum foundation requirements appear in the diag...

Страница 6: ... to satisfactory condition before returning it to service DO NOT exceed the capacity of your jib See SPECIFICATIONS table on p 2 or p 3 The weights of the load hoist trolley rigging and all other equipment attached to the jib must be added together to determine the net weight applied to the jib The net weight must never exceed the capacity Always perform the FUNCTION TESTS p 8 before each use Info...

Страница 7: ... and pin it to the mast at the desired angle See BOOM ANGLE ADJUSTMENT on p 8 Confirm that the mast is able to rotate freely through the necessary range by carefully pushing the end of the boom in both directions Step 5 Connect the power cord to the power supply On DC powered units the power supply cord and pendant control cable must be plugged into the winch Step 6 Lower and raise the cable hook ...

Страница 8: ... The winch will operate only while a control button is pressed Releasing a control button will stop the winch and the hook will maintain its position Lower the hook sufficiently that the load rigging can be attached to it The load center should be directly below the hook to prevent significant load swing as the load rises Proper and improper positioning is diagrammed below Improperly positioned lo...

Страница 9: ...easure the throat opening of the hook and record the measurement Collate all writings and photos into a single file This file is a record of the unit in satisfactory condition INSPECTIONS MAINTENANCE Inspect and maintain the unit as described below to preserve satisfactory operability Compare all inspection results to the RECORD to determine whether a component is in satisfactory condition or requ...

Страница 10: ... meter Charge battery is low 12 65V full charge 2 Cable jumps or lurches as the winch operates d Poor spooling on winch reel drum e Kink in cable d Spool out the cable Inspect it for kinks etc Respool cable onto winch reel Replace cable if damaged e Replace cable if kinks cannot be straightened 3 Winch motor hums but drum does not rotate f Overload condition g Supply voltage too low f Reduce load ...

Страница 11: ...ydraulic pumps motor controllers and cylinders It also covers defects in original parts that wear under normal usage conditions wearing parts such as bearings hoses wheels seals brushes and batteries How long is the warranty period The warranty period for original dynamic components is 90 days For wearing parts the warranty period is 90 days Both warranty periods begin on the date Vestil ships the...

Отзывы: