Rev. 1/4/2017
AHSN, MANUAL.doc
Copyright 2017 Vestil Manufacturing Corp.
Page 23 of 26
Connect the load to the hoist chain/cable, according to the instructions supplied with your hoist and the
method applied at your work site; then raise the load only as high as is necessary to position it. Once the load is
properly centered above the work location, lower the load until it is fully supported by the ground or work surface
and disconnect the load from the hoist. Return the crane and hoist to their storage locations.
If you must move the load to a different location, return the load to the ground and disconnect it from the hoist.
Move the crane and load separately to the desired work location. Only use the crane to lift loads
.
Festoon Kit (option)
Item no. Part no.
Description
Quantity
2
28-016-169
Hold down plate
2
3 28-145-002 I-beam
clamp
4
4 42234
3
/
8
in. -16 x 1in. turned eye bolt
2
5 33008
3
/
8
in. zinc-plated flat washer
2
6 36106
3
/
8
in. -16 zinc-plated hex nut
2
7 37030
1
/
2
in. – 13 nylon insert lock nut
4
8 11211
1
/
2
in. – 13 x 2 in. HHCS zinc-plated bolt
4
9 33012
1
/
2
in. zinc-plated USS flat washer
8
10 45503
1
/
8
in. wire rope (1 in. longer than 1-beam)
1
11
34785T4
Quick-grip wire rope clamp
2
12
CV200
Plastic cable tie
7
13 O-RING15 Metal
ring
6
14
FCOIL 143-001 Coiled power cord
1