Step 4: Fasten I-beam to uprights.  
[NOTE: Shim only used with models AHSN-6-20-12, 6-20-14, 6-20-16, 8-20-12, 8-20-14 & 8-2016.] 
a.  Insert the flange of the I-beam into the gap between the beam clamp and the top of the uprights (see FIG. 4B 

below); 

 

b.  Then clamp the flange on the opposite side of the beam to the beam bracket with the remaining beam clamps 

as shown in the diagram below. 

 

 
 
 
 

                                                                                          

 

                                                          
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 
 
 
 
 

 

Step 5: Tighten the beam clamp nuts and bolts to 50 - 52 ft·lb of torque. 

 

Step 6: Put the crane on its feet. 
Rotate the crane onto its feet in a 

controlled

 manner. For instance, attach a hoist chain to the I-beam and 

slowly

 

raise the beam until the crane stands on its feet. Alternatively, raise the crane with a fork truck. Position the forks 
under the I-beam and slowly raise the beam until the crane rotates onto its feet in a controlled manner. 
 

                 

                                    
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Fig. 3D:  

Top view of beam connection to 
upright 

Approach the crane with 
a fork truck from this side 
and slide the forks under 
the I-beam. 

 

Slowly raise the beam 
and drive forward until 
the crane stands on its 
feet.

 

FIG. 4B:

 

Clamp the I-beam to the tops of the uprights

 

 

 
 
 
 

 

Flange of I-
beam 

 

I-beam 

 

Upright 

 
 
 

Beam clamp 

 

Shim 

 

FIG. 4D: Beam-to-upright connection including shim

 

 

 

Shim  

Beam flange  

Beam 
clamp  

 

 

FIG. 4C: Beam-to-upright connection  

 
 
 

 

FIG. 4A

:

   End View of I-beam 

Connection to Beam Bracket

 

Beam 
flange  

Beam 
clamp  

Содержание AHSN Series

Страница 1: ...s product Table of Contents Table of Figures Product Specifications 2 3 Fig A Exploded parts diagram AHSN 2 10 12 2 10 14 2 10 16 5 Signal words 4 Fig B Exploded parts diagram AHSN 2 15 series 6 Safet...

Страница 2: ...HSN 2 15 10 67 13 16 in 172 cm 179 3 4 in 457 cm 120 3 8 in 306 cm 149 3 4 in 380 cm 126 3 8 in 321 cm 2 000 909 kg 779 lb 354 kg AHSN 2 15 12 79 3 4 in 203 cm 179 3 4 in 457 cm 143 7 8 in 365 cm 149...

Страница 3: ...lb 489 7 kg AHSN 6 15 16 88 in 224 cm 179 3 4 in 457 cm 192 15 16 in 490 cm 149 3 4 in 380 cm 203 1 16 in 516 cm 6 000 2 727 kg 1 126 lb 511 8 kg AHSN 6 20 12 76 1 4 in 194 cm 239 3 4 in 609 cm 145 3...

Страница 4: ...damage such as operation that might damage the crane Safe use recommendations Failure to read and understand the instructions included in this manual before using or servicing the crane constitutes mi...

Страница 5: ...combo 1 2in 13 A325 structural nut 1 2in 13 x 2in A325 structural bolt 8 8 7 33620 5 16in lock washer zinc plated 16 8 11053 5 16in 18 x 3 4in HHCS 2 zinc plated bolt 16 9 33006 5 16in USS flat washe...

Страница 6: ...006 5 16 in zinc plated USS flat washer 16 10 28 514 238 28 514 239 28 514 240 28 514 241 28 514 242 28 514 242 Leg weldment AHSN 2 15 7 AHSN 2 15 9 AHSN 2 15 10 AHSN 2 15 12 AHSN 2 15 14 AHSN 2 15 16...

Страница 7: ...325 structural nut 1 2in 13 x 2in A325 structural bolt 8 8 7 33620 5 16 in zinc plated lock washer 16 8 11053 5 16 in 18 x in HHCS 2 zinc plated bolt 16 9 33006 5 16 in zinc plated USS flat washer 16...

Страница 8: ...16 7 11053 5 16 in 18 x in HHCS 2 zinc plated bolt 16 8 33006 5 16 in zinc plated USS flat washer 16 9 28 514 241 28 514 242 28 514 242 Leg weldment AHSN 4 10 12 AHSN 4 10 14 AHSN 4 10 16 4 4 4 10 28...

Страница 9: ...9 28 514 238 28 514 239 28 514 240 28 514 241 28 514 242 28 514 242 Leg weldment AHSN 4 15 7 AHSN 4 15 9 AHSN 4 15 10 AHSN 4 15 12 AHSN 4 15 14 AHSN 4 15 16 4 4 4 4 4 4 10 28 112 027 Pin axle pivot ro...

Страница 10: ...A325 structural nut 1 2in 13 x 2in A325 structural bolt 8 8 7 33620 5 16 in zinc plated lock washer 16 8 11053 5 16 in 18 x in HHCS 2 zinc plated bolt 16 9 33006 5 16 in zinc plated USS flat washer 16...

Страница 11: ...HHCS 2 zinc plated bolt 16 16 13111 3 8 in 16 x 2in HHCS 5 zinc plated bolt 2 7 28 514 241 28 514 242 Leg weldment AHSN 6 10 12 AHSN 6 10 14 AHSN 6 10 16 4 4 17 33008 3 8 in USS flat washer zinc plat...

Страница 12: ...53 5 16 in 18 x in HHCS 2 zinc plated bolt 16 16 33008 3 8 in USS flat washer zinc plated 4 7 28 514 238 28 514 239 28 514 240 28 514 241 28 514 242 Leg weldment AHSN 6 15 7 AHSN 6 15 9 AHSN 6 15 10 A...

Страница 13: ...241 28 514 242 Weldment leg AHSN 6 20 12 AHSN 6 20 14 AHSN 6 20 16 4 4 16 33008 3 8 in USS flat washer zinc plated 4 7 28 112 027 Pin axle pivot roller 2 17 36106 3 8 in 16 hex nut zinc plated 2 8 28...

Страница 14: ...al bolt 8 8 15 28 514 258 Weldment cross brace bolt end 6k 8k 2 6 11053 5 16 in 18 x in HHCS 2 zinc plated bolt 4 16 13111 3 8 in 16 x 2in HHCS 5 zinc plated bolt 2 7 28 514 241 28 514 242 Leg weldmen...

Страница 15: ...5 structural nut 1 2in 13 x 2in A325 structural bolt 8 8 15 28 514 258 Weldment cross brace bolt end 6k 8k 2 6 11053 5 16 in 18 x in HHCS 2 zinc plated bolt 4 16 33008 3 8 in USS flat washer zinc plat...

Страница 16: ...lated bolt 2 6 28 514 241 28 514 242 Leg weldment AHSN 8 20 12 AHSN 8 20 14 AHSN 8 20 16 4 4 16 33008 3 8 in USS flat washer zinc plated 4 7 28 112 027 Pin axle pivot roller 2 17 36106 3 8 in 16 hex n...

Страница 17: ...5 16 in 18 x in HHCS 2 zinc plated bolt 14 15 16 132 305 Batwing caster position lock 4 6 28 112 027 Pin axle pivot roller 2 16 28 014 393 Steel I beam 1 7 28 112 007 3 4 in retaining pin 2 17 28 514...

Страница 18: ...damaged you could sustain serious injuries if the crane collapses Contact Vestil to order replacement parts DO NOT use the crane if any of the casters is damaged A damaged caster may cause the crane...

Страница 19: ...structural nut 19211 A in zinc plated lock washer 33626 Fig 2 Upright to Leg Assembly Connections Pin upright to yoke Adjustment pin part no 28 112 027 Adjustment pin Hitch pin Beam clamp Hitch pin Be...

Страница 20: ...ontrolled manner For instance attach a hoist chain to the I beam and slowly raise the beam until the crane stands on its feet Alternatively raise the crane with a fork truck Position the forks under t...

Страница 21: ...caster to the foot of each leg using the hardware as shown in the diagrams below 3 Fig 7C Caster attachment AHSN 10 15 10 1 in 13 lock nut 2 Batwing caster position lock 3 8in x 3in ductile steel cast...

Страница 22: ...the crane Always follow the hoist and trolley manufacturers instructions regarding proper use of their products BEFORE the load is connected to the hoist lock or immobilize the casters for instance wi...

Страница 23: ...a different location return the load to the ground and disconnect it from the hoist Move the crane and load separately to the desired work location Only use the crane to lift loads Festoon Kit option...

Страница 24: ...ction or stretch beyond hoist manufacturer s recommendations Inspect weekly All functional operating mechanisms wheels casters uprights leg tubes pins and yokes bolts and nuts including anchor bolts a...

Страница 25: ...Manufacturing Corp Page 25 of 26 Markings and Labels NOTE Periodically inspect the labels affixed to the product Clean the labels as necessary to maintain legibility from a reasonable viewing distanc...

Страница 26: ...ity in Angola IN The warranty covers defects in the following original dynamic components motors hydraulic pumps electronic controllers switches and cylinders It also covers defects in original parts...

Отзывы: