Operating principle

The bio reactor is a continuous greywater treatment plant. 

The bio reactor can be installed as a greywater treatment solution for detached 

houses or holiday homes. It meets the strictest requirements of the Government Decree on Treating Domestic Wastewater in Areas Outside 
Sewer Networks (209/2011) under all circumstances. Interruptions in use or overloads do not disrupt the system’s operation.

The operating principle of the Bio-3 Reactor is simple. It is based on the oxidation and biological 
treatment of wastewater so that the biological layer that accumulates on the surface of the 
biomodules enhances the treatment of the nutrients contained by the wastewater.

1

The greywater is conveyed into the tank’s first compartment through an inclined sewer.

In the first compartment, fats and solids are removed from the greywater.

The greywater is moved by gravity from the bottom of the second compartment to the 
biomodules.

In the biomodules, the greywater is aerated with small oxygen bubbles.

In the third compartment, the greywater settles and the separation of solids is ensured.

The wastewater is conveyed from the bottom of the third compartment to its discharge 
location.

The coarse filter in the outlet sewer completes perfect separation

   The oxidation blower operates continuously.
   From the bio reactor, the wastewater is conveyed to an approved discharge location.

2

4

3

5

7

6

1

3

4

5

6

7

2

Содержание BIO-3 REACTOR

Страница 1: ...Bio 3 Reactor Greywater Reactor Installation Operation Service Instructions...

Страница 2: ...CONTENTS Bio 3 Reactor properties Safety Operating principle Installation requirements Installation 01 02 03 04 05 Commissioning operation service warranty contact information 06...

Страница 3: ...Temporary capacity 900 l day Oxidation 1 air pump 45 W Material Concrete Plastic Weight Height Diameter Sewer inlet bottom Sewer outlet bottom Risers approx 1 200 kg 2 200 mm 1 200 mm 1 215 mm 110 mm...

Страница 4: ...e riser section The electrical installation must be carried out by a professional electrician with the necessary permits The cover must be locked with a padlock Please take the weight of the tank into...

Страница 5: ...biomodules enhances the treatment of the nutrients contained by the wastewater 1 The greywater is conveyed into the tank s first compartment through an inclined sewer In the first compartment fats an...

Страница 6: ...xcavator Sand bedding Frost insulation Soil compactor Well ring hoist grippers Hammer Professional electrician Shovel Installer Sewers sewer components 110 mm Lubricant Padlock Spirit level Tape measu...

Страница 7: ...seal stays in place during the installation 7 NB If the sewer is at a depth exceeding 700 mm install a sufficient number of concrete well rings between the bottom section and the riser Seal the joint...

Страница 8: ...e air pump s filter annually when the tank is emptied Unscrew the screw on top of the blower using a screwdriver Remove the filter cover and clean or change the filter Put the clean filters back in pl...

Страница 9: ...Maintenance Operations Notes DATE MAINTENANCE OPERATION PERFORMER...

Страница 10: ...Surname Address Telephone E mail Name Surname Address Telephone E mail Name Surname Address Telephone E mail Water Sewage Consultant Planning Place of Purchase Supplier Sludge Removal Installer Contr...

Отзывы: