![VESTEL Westline WGE 4 WH Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/vestel/westline-wge-4-wh/westline-wge-4-wh_operating-and-installation-instructions_1009321043.webp)
9
3. INSTALLATION AND PREPARATIONS FOR USE
Installing your hob
The Hob is supplied with a special seal in order to avoid any liquid ingress in the work top. Cut out an
opening in the top of your kitchen unit that corresponds to the measurements given in figure. Apply
the self adhesive seal to all edges of
the section
and carefully fit the hob into the opening in such a way
that the knobs will be
on the right
side.
The thickness of the top of your kitchen unit must be between the dimensions given in the figure. For
the thickness less than 25 mm the thick wooden spacers can be inserted between the bracket and
undersurface. If the thickness is greater than 25 mm slots can be cut in the under surface of the
furniture to house the bracket.
Figure 6
Wall
A[mm] B[mm]
Combustible
60 150
Non-combustible
40
5
0
510 mm
Min.
A
490 mm
Min.
B
Min.
130mm
Min.
25mm
580 mm
560 mm
42 mm
The leaf springs located on the lower left and right sides of the hob will fix the hob in the opening.
Create a space to install your hob, following the dimensions indicated on figure.
•
100 mm from edge of cooker to combustible materials.
•
7
0
0
mm underside of overhead cupboards, shelving
•
750mm underside of overhead extractor fans.
This appliance must be installed according to the manufacturers installation instructions, local building
regulations, gas authority codes and electrical wiring instructions.