
:*&,7*&,70RGHO
,QVWDOODWLRQDQG0DLQWHQDQFH
6HUYLFH0DQXDO
Remove the 2 screws fixing the cover of elec-
tric box. Lift to remove the cover. Loosen the
wire and disconnect the terminal. Lift to re-
move the electric box assy.
6.Remove electric box assy
Electric box assy
Unscrew the fastening nut of the 4-way Valve
Assy coil and remove the coil. Wrap the 4-
way Valve Assy with wet cotton and unsolder
the 4 weld spots connecting the 4-way Valve
Assy to take it out.(Note: Refrigerant should
be discharged firstly.) Welding process
should be as quickly as possible and keep
wrapping cotton wet all the time. Be sure not
to burn out the lead-out wire of compressor.
7.Remove 4-way valve assy
8.Remove capillary sub-assy
Unsolder weld point of capillary Sub-assy,
valve and outlet pipe of condensator. Then
remove the capillary Sub-assy. Do not block
the capillary when unsoldering it. (Note: be-
fore unsoldering,discharge refrigerants
completely)
4-way Valve Assy
Capillary Sub-assy
6WHSV
3URFHGXUH
Содержание GC09IT
Страница 1: ...Service Manual R410A Vidicon Ltd Commercial Air Conditioners R410A Systems 0RGHOV 7 7 7 7 ...
Страница 20: ... 7 7 0RGHO 7HFKQLFDO QIRUPDWLRQ 6HUYLFH 0DQXDO Signal sender Battery Cover of battery box Remove Reinstall ...
Страница 60: ... 7 7 0RGHO QVWDOODWLRQ DQG 0DLQWHQDQFH 6HUYLFH 0DQXDO 2XWGRRU 8QLW ...
Страница 87: ...Vidicon Ltd Commercial Air Conditioners R410A Systems ...