
:*&,7*&,70RGHO
,QVWDOODWLRQDQG0DLQWHQDQFH
6HUYLFH0DQXDO
When the pipings are
disconnected, protect the
both openings from entering
moisture.
10. Remove evaporator assy
1
Remove the indoor unit
from the installation
plate.
2
Release the hook of the
piping fixture on the
back of the unit.
Gas piping
Liquid piping
Auxiliary piping
Piping fixture
Steps
Points
Procedure
Содержание GC09IT
Страница 1: ...Service Manual R410A Vidicon Ltd Commercial Air Conditioners R410A Systems 0RGHOV 7 7 7 7 ...
Страница 20: ... 7 7 0RGHO 7HFKQLFDO QIRUPDWLRQ 6HUYLFH 0DQXDO Signal sender Battery Cover of battery box Remove Reinstall ...
Страница 60: ... 7 7 0RGHO QVWDOODWLRQ DQG 0DLQWHQDQFH 6HUYLFH 0DQXDO 2XWGRRU 8QLW ...
Страница 87: ...Vidicon Ltd Commercial Air Conditioners R410A Systems ...