In order to keep the unit in good order the following maintenance rou ne is recommended:

Filters should be inspected every three months. If they are found to be heavily soiled or damaged in
any way they should be replaced. A failure to replace filters periodically will result in a drop in
arrestance efficiency and unit performance. Spare filters can be ordered from VES spares department.

The fan impeller should be cleaned every 6 months. Failure to clean the fan on a regular basis could
result in loss of fan performance, or cause it to fall out of balance. If a fan is sta onary for long periods
in a humid atmosphere, it should be switched ON for minimum of two hours every month to remove
any moisture that may have condensed within the motor.
The fan motors are maintenance free due to the use of ball bearings with ‘life-long lubrica on’.
At the end of the grease life it will be necessary to change the bearings or change the fan unit. The life
expectancy of bearings for standard usage is approximately 30 - 40000 hours.
Failure to keep dampers clean could result in the damper becoming inopera ve. Clean damper blades
and frames and lubricate with PTFE aerosol or equivalent.
The heat exchanger matrix should be inspected for debris, dust or dirt build up. If found contaminated,
foreign ma er should be removed accordingly; superficial dust or debris can be removed from the
surface of the heat exchange by gently brushing. Loosened debris can then be vacuumed from the
surface of the matrix or flushed through with warm water. Stubborn deposits can be removed by using
a low pressure washer with an approved detergent solu on. The solu on temperature should not
exceed 50 °C. When using any pressure device care must be taken not to damage the heat exchanger
matrix.

Under NO circumstances should the heat exchanger be steam cleaned.

Ensure the drain pan and the drain connec on is free from debris ensuring any condensate produced
can freely drain away. Where a pump is fitted check the sensor and float for contamina on. Clean as
required using a 95 / 5% Water/Chlorine solu on. Check also all associated pipework. Any found to
be damaged or blocked should be replaced, spare replacement pipes being available from VES.
Should a full service be required it may be necessary to disassemble the unit casework to gain access
to some components.

Ecovent 

Counterflow 

units are supplied with unpainted galvanised steel cases as standard but have

an op on for powder coat paint finish. Check all painted items to ensure that they have not
deteriorated, par cularly where adverse environmental condi ons prevail. Re-paint as necessary.
Matching paint can be supplied upon request.

When enquiring a er or ordering spares contact VES Spares Department, quo ng the sales order (SO)
number and unit type as found on the unit nameplate.

Tel: 08448 15 60 60 • Fax: 02380 26 12 04

At the end of their useful life the packaging and product should be disposed of via a suitable
recycling centre. Do not dispose of with normal household waste. Do not burn.

PLEASE ENSURE THAT THIS DOCUMENT IS PASSED ON TO THE END USER

Cau on

WEEE Direc ve

Maintainance

6

Содержание ecovent ECVB262-1

Страница 1: ...l Instructions Eagle Close Chandlers Ford Industrial Estate Chandlers Ford Eastleigh Hampshire SO53 4NF Tel 44 0 2380 46 11 50 email info ves co uk web www ves co uk Issue G Operation Maintenance Manu...

Страница 2: ...dvice for personnel or potential unit property damage Indicates important information Warning Caution Important Important Conventions ecovent Heat Recovery Units page Introduc on 2 Nomenclature 3 Rece...

Страница 3: ...ng Null No Hea ng E Electric Heater Ba ery W LPHW Coil 9 In ll DS 25mm double skinned EE 50mm double skinned 10 Handing LT Le Top Access denotes posi on of RT Right Top Access supply air ow LIDSAF LB...

Страница 4: ...not obstructed in any way and safe working access for maintenance must be provided in accordance with Health and Safety and Building Regula ons For con rma on of required access please see the appropr...

Страница 5: ...included Ensure that the drop rod used is selected appropriatedly to accomodate the load of the unit Unit moun ng detail Fig 3 4 5 Installa on 4 Important Ecovent units with ed silencers are sec onal...

Страница 6: ...be opened either way or removed completely Each handle assembly features a lockable handle secured as standard by an M4 Hex key In order to open the hinges correctly the locks must be in the open pos...

Страница 7: ...are recommended It is important that water and steam coils are protected against damage from extreme weather condi ons during the winter season If the water is allowed to freeze in the coil system dam...

Страница 8: ...t sec on Should this posi on be inappropriate an alternate posi on is available on the opposite side of the unit For further informa on regarding alterna ve condensate pipe rou ng please contact VES o...

Страница 9: ...connector to be supplied by others Terminate through the case onsite as required ensuring that any swarf is removed and that the unit is sealed a er connec on Should it be required to remove any comp...

Страница 10: ...utlet and associated pipework Make certain all swarf is removed before use It is the customer s responsibility to supply earth fault protec on through the building installa on device and a dedicated i...

Страница 11: ...doubt for units with ed VES controls or for special versions of the units consult the wiring diagram in your document pack or contact VES Customer Services Department on 08448 15 60 60 quo ng the sale...

Страница 12: ...12 www ves co uk ecovent Heat Recovery Units Not tted on EVC5 Con nued Standard Isolator arrangement Fig 20 Standard Wiring Fan Installa on 5 19 19...

Страница 13: ...13 www ves co uk ecovent Heat Recovery Units Con nued Standard Control Panel Arrangement Fig 21 Con nued over on page 14 Standard Wiring Fan Installa on 5...

Страница 14: ...14 www ves co uk ecovent Heat Recovery Units Con nued Con nued from page 13 Standard Control Panel Arrangement Fig 22 Standard Wiring Fan Installa on 5 19 19 Not tted on EVC5...

Страница 15: ...if the fan is rubbing To align loosen the fan inlet eye xings and adjust the pos on so that the gap between inlet and fan are equidistant Ensure the fan runs freely in the new posi on re ghten the xi...

Страница 16: ...to the calcula on as below or by using the di eren al pressure curve Simply read across from the pressure measurement to the fan curve and down to calculate the resultant air volume If the unit featur...

Страница 17: ...avoid damage to the unit or injury to personnel This is par cularly important with bottom access units Ensure the AHU has been allowed to completely cool before a emp ng any work to the unit For units...

Страница 18: ...l xings are securely ghtened To remove the fan assembly Fig ensure the unit is fully isolated Separate the supply plugs to the fan as shown above Detach the measuring tube from the inlet ring and stow...

Страница 19: ...n mounted on an adapter plate To remove unplug as per Fig undo the two screws and carefully remove the fan adapter plate assembly retaining all xings To replace the fan assembly secure one xing leavin...

Страница 20: ...of the heat exchange by gently brushing Loosened debris can then be vacuumed from the surface of the matrix or ushed through with warm water Stubborn deposits can be removed by using a low pressure w...

Страница 21: ...gh Hampshire SO53 4NF Tel 44 0 2380 46 11 50 email info ves co uk web www ves co uk VES is a trading name of VES Andover Ltd Registered in England No 02303719 Registered Office as above VES Andover Lt...

Отзывы: