Vertiv™ XTE PTS Series PEIL/PESB Power Transfer Switches Description & Installation Manual
10
Figure 7:
Mounting Template Installation
Installing the Mounting Template
If you are using the mounting template kit (part number PEIL/RPEIL-TEMP), then perform the following steps to install it:
1.
Verify that all components (listed in
) are included in the kit:
Table 1:
Contents of Mounting Template Kit
Quantity
Description
1
Template
4
1/2-13x6-inch (15.24 cm) J-bolts
8
1/2-13 nuts
8
1/2-inch flat washers
2.
Install one of the 1/2-13 nuts on each J-bolt. Thread the nut down, leaving approximately five threads below the nut.
3.
Slide one flat washer on each J-bolt.
4.
Slide each J-bolt through the 9/16-inch (1.43 cm) hole on the template.
5.
Install a flat washer onto each J-bolt on the top side of the template., then install a nut.
6.
Turn the J-bolts outwards, toward the front and back sides of the template, then tighten the nuts.
3-inch (7.6 cm) hole for 2
1
/
2
-inch (6.4 cm)
incoming power company service
conduit for the RPEIL Series cabinet
4 1/2-13 by 6-inch (15.24 cm)
J-bolts, turned outwards to the
front and back of the template,
to mount the template to the pad
Form is constructed
of 2 by 6-inch (5
by 15 cm) boards.
front of
cabinet
3 by 6-inch (7.6 by 15.2 cm)
slot, 2 2
1
/
2
-inch (6.4 cm)
holes, and 4 1
3
/
8
-inch (3.5 cm)
holes for outgoing power
to power
end chamber
3-inch (7.6 cm) hole for 2
1
/
2
-inch (6.4 cm)
incoming power company service
conduit for the PEIL Series cabinet
Secure template to
stakes and level before
pouring concrete.
Top surface of template
should be level with top
surface of form and flush
with concrete surface.