20. Refer to Figure 4.12 below as a final check of your condensate pump installation.
21. Route the wire harness from the condensate pump to the electric box, and connect it to the
condensate-pump fuse block.
Figure 4.12 Condensate-pump installation
NO.
DESCRIPTION
NO.
DESCRIPTION
1
1/2-in. copper drain line
4
Rubber drain line
2
Condensate pump wire harness
5
Right side
3
1/2-in. copper drain line
6
Front of unit
Vertiv
| SmartRow DCR Installer/User Guide |
27
Содержание SmartRow DCR
Страница 1: ...SmartRow DCR 3 to 6 Rack 20 kW N N 1 and 5 to 10 Rack 36 kW N Cooling Units 60 Hz Installer User Guide...
Страница 6: ...Vertiv SmartRow DCR Installer User Guide 6...
Страница 12: ...Vertiv SmartRow DCR Installer User Guide 12 This page intentionally left blank...
Страница 52: ...Vertiv SmartRow DCR Installer User Guide 52 This page intentionally left blank...
Страница 66: ...Vertiv SmartRow DCR Installer User Guide 66 This page intentionally left blank...
Страница 70: ...Vertiv SmartRow DCR Installer User Guide 70 This page intentionally left blank...
Страница 72: ...Vertiv SmartRow DCR Installer User Guide 72 This page intentionally left blank...
Страница 76: ...Vertiv SmartRow DCR Installer User Guide 76 This page intentionally left blank...
Страница 82: ...Vertiv SmartRow DCR Installer User Guide 82 This page intentionally left blank...
Страница 101: ......