Vertiv
|
NetSure 502NGFB Installation Manual (Section 6009)
|
Rev. Z
23
Bullet Nose-Type Load Distribution Circuit Breakers (List BC, LC and NC)
Procedure
NOTE!
1.
Open the Distribution Unit’s front access panel.
2.
Install correctly sized bullet nose-type circuit breakers into the mounting positions located inside the
Distribution Unit, as required. Orient the circuit breaker with the ON position to the right. Ensure the
alarm contact on the back of the circuit breaker makes contact with the alarm terminal on the mounting
circuit card.
3.
When finished, close the Distribution Unit’s front access panel.
Figure 8:
Installing Bullet-Nose-Type Load Distribution Circuit Breakers (List BC, LC and NC)
Front
Load Distribution
Circuit Breakers
Содержание NetSure 502NGFB Series
Страница 10: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 10 This page is intentionally blank ...
Страница 37: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 37 Figure 14 Controller RJ 45 Ethernet Port ...
Страница 45: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 45 Figure 20 Battery Connections ...
Страница 85: ...Vertiv NetSure 502NGFB Installation Manual Section 6009 Rev Z 85 This page is intentionally blank ...
Страница 86: ...Vertiv com Vertiv Headquarters 1050 Dearborn Drive Columbus OH 43085 USA Section 6009 RZ 2020 ...