Vertiv™ NetSure™ -48 VDC Battery Rack System Installation and User Manual
Proprietary and Confidential © 2022 Vertiv Group Corp.
10
Installing Batteries into a Battery Tray (cont’d from previous page)
Installing Optional Spacer Shims
Optional Shim
P/N 564337
(installed at top)
Factory Installed
Bottom Bracket
Optional Shim
P/N 564337
(installed
at bottom)
To install shims, remove spacers and hardware
then re-install with shims. Use multiple shims
as required.
Torque to 31 in-lbs.
Spacers separate
batteries (3 front &
3 back per tray).
3/8” Ground Washer
3/8-16 x 1” Bolt
(4 places)
Torque to 180 in-lbs.
1/4-20 x 3/4” Bolt
(2 places)
Torque to 84 in-lbs.
1/4” Ground Washer
Mount Covers to Rack
3/8” Flat Washer
3/8” Ground Washer
3/8” Flat Washer
1/4” Flat Washer
Installing Front Covers