background image

 

No installation and handling facing down

 

禁止底面朝上安装与搬运

BOTTOM

Donn't carry and install 

upside down

BOTTOM

 

Figure 2-5    Wrong installing and carrying direction 

2.4    Cable Connection 

 

Danger

 

Danger

 

1. Switch off all MCBs before the electrical connection. 
2. Only the qualified personnel can do the mains cable connection. 

3. Before electrical connection, make sure all the AC MCBs of the power system are 
switched off, the AC 230/400V 20A double pole C type MCB is recommended. 
4. There is a dangerous voltage in the primary circuit, disconnect the power supply before 
maintenance. 

 

The  configuration  and  connection  position  of  NetSure  2100  A31-S2  are  shown  in  Figure 

2-6. 

 

N
L

 

M6 grounding stud

AC input terminal L

AC input terminal N

Controller

Expansion board of dry contact

Load output route 1 MCB

Battery MCB

NetSure 2100 A31-S2 front view

Rectifiers 1 ~ 3

Battery input terminal

Temp. cable input port

NetSure 2100 A31-S2 rear view

Load output route 2 MCB
Load output route 3 MCB
Load output route 4 MCB

Load output route 4 MCB
Load output route 3 MCB
Load output route 2 MCB
Load output route 1 MCB

 

Figure 2-6    NetSure 2100 A31-S2 layout 

The  configuration  and  connection  position  of  NetSure  2100  A31-S3  are  shown  in  Figure 

2-7. 

 

N
L

NetSure 2100 A31-S3 front view

 

DI/DO/RS485 port

NetSure 2100 A31-S3 rear view

AC input terminal N

M6 grounding stud

AC input terminal L

Rectifiers 1 ~ 3

Controller

Load output route 1 MCB

Battery MCB

Load output route 2 MCB
Load output route 3 MCB
Load output route 4 MCB

Load output route 4 MCB
Load output route 3 MCB
Load output route 2 MCB
Load output route 1 MCB

Battery input terminal

Temp. cable input port

 

Figure 2-7    NetSure 2100 A31-S3 layout 

2.4.1    Connecting Earth Cable 

A M6 grounding stud is reserved on the mounting bracket. The grounding cable is 
yellow-green double-color cable, with cable specification up to 10mm

2

. The cable ends are 

crimped to the OT terminals. The maximum OT10-6 terminals are used. Connect one end 
of the grounding cable to the M6 ground stud (see Figure 2-6, Figure 2-7) and the other 
end to the grounding bar of the 19-inch rack system. 

2.4.2    Connecting AC Input Cables 

1. The routing method of the AC input cables is same as that of the earth cables. Connect 
the live line (L) and neutral line (N) of the AC input cables respectively to the lower 
terminals of the power system AC input terminal L and AC input terminal N, as shown in 
Figure 2-8. Terminal connection method: Using a flat-blade screwdriver, press the terminal 
clamp as shown in Figure 2-8, insert the cable end into the corresponding port, and loosen 
the screwdriver to press the cable end. 

 

N
L

-
+

AC input terminal N

AC input terminal L

 

 

Figure 2-8    Illutration of connection terminal   

2.4.3    Connecting Load Cables 

The power system can be connected with four routes of load respectively controlled by 
four MCBs, as shown in Figure 2-6, Figure 2-7. Connect the negative load cable to the 
corresponding load '-' and then connect the positive load cable to the corresponding load 
'+' (see Figure 2-9). For the terminal connection method, please refer to 

2.4.2    Connecting 

AC Input Cables

N

L

-

+

 

Figure 2-9    Illutration of load connection terminal   

Содержание NetSure 2100 A31-S2

Страница 1: ...drop mechanical strength and the cable design should meet relevant industry standards With cable length shorter than 30m the CSA calculation should be based on the current density of 2 5A mm2 The suggested CSA value is not more than 10mm2 Select the DC load cable CSA according to the Table 2 1 Table 2 1 DC load cable CSA selection Load route rated current Max output current Min cable CSA Max cable...

Страница 2: ... 3 MCB Load output route 4 MCB Load output route 4 MCB Load output route 3 MCB Load output route 2 MCB Load output route 1 MCB Battery input terminal Temp cable input port Figure 2 7 NetSure 2100 A31 S3 layout 2 4 1 Connecting Earth Cable A M6 grounding stud is reserved on the mounting bracket The grounding cable is yellow green double color cable with cable specification up to 10mm2 The cable end...

Страница 3: ...nd then insert the terminal into the controller front panel as shown in Figure 2 11 Users need to prepare signal cable themselves Table 2 2 Correlation of ports RS232 port DB9 port 1 Tx 2 2 Rx 3 3 GND 5 Connecting M831A dry contact output port The controller is configured with four pairs of alarm dry contact output DO1 DO4 as standard configuration and two routes of DI input and one route of RS485...

Страница 4: ...cal engineer can maintain and operate this equipment In operation the installation personnel are not allowed to wear conductive objects such as watches bracelets bangles and rings During operation parts of this equipment carry hazardous voltage Wrong operation may result in severe or fatal injuries and property damage Before the test Installation check must be done before testing Then the batterie...

Страница 5: ...Charge Shunt Number 1 String1 norminal capactity Batt Charge String1 norminal capactity 100Ah String1 rated current Batt Charge String1 rated current 75A String1 rated voltage Batt Charge String1 rated voltage 25mV Float voltage Batt Charge Float voltage 53 5V Boost voltage Batt Charge Boost voltage 56 4V LVD2 Enable LVD LVD2 Enable Enable LVD2 voltage LVD LVD2 voltage 43 2V Contactor type LVD Con...

Отзывы: